m
m
Line 13: Line 13:
 
*Pervious concrete: None
 
*Pervious concrete: None
 
*Porous asphalt: 1inch of AASHTO No. 57 stone
 
*Porous asphalt: 1inch of AASHTO No. 57 stone
*PICP: 2 inches of AASHTO No. 8 stone (MnDOT 3127FA-3)</td>
+
*PICP: 2 inches of [http://www.transportation.org/Pages/default.aspx AASHTO] No. 8 stone ([http://www.dot.state.mn.us/pre-letting/spec/2005/3101-3491.pdf MnDOT 3127FA-3])</td>
 
<td>Washed free of fines</td>
 
<td>Washed free of fines</td>
 
</tr>
 
</tr>
Line 20: Line 20:
 
<td>
 
<td>
 
*Pervious concrete: AASHTO No. 57 stone or per hydraulic design
 
*Pervious concrete: AASHTO No. 57 stone or per hydraulic design
*Porous asphalt:AASHTO No. 2, 3, or 5 stone
+
*Porous asphalt:AASHTO No. 2, 3, or 5 stone
*PICP: 4 inches of AASHTO No. 57 base and AASHTO No.2, 3 or 4 stone subbase</td>
+
*PICP: 4 inches of AASHTO No. 57 base and AASHTO No.2, 3 or 4 stone subbase</td>
 
<td>Stone layer thickness based on the pavement structural and hydraulic requirements. Stonewashed and free of fines. Recommended minimum void ratio = 0.4.</td>
 
<td>Stone layer thickness based on the pavement structural and hydraulic requirements. Stonewashed and free of fines. Recommended minimum void ratio = 0.4.</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Underdrain (optional)</td>
 
<td>Underdrain (optional)</td>
<td colspan="2">Use 4 to 6 inch diameter perforated PVC (AASHTO M-252) pipe or corrugated polyethylene pipe. Perforated pipe installed for the full length of the permeable pavement cell, and non-perforated pipe, as needed,connected to storm drainage system.</td>
+
<td colspan="2">Use 4 to 6 inch diameter perforated PVC (AASHTO M-252) pipe or corrugated polyethylene pipe. Perforated pipe installed for the full length of the permeable pavement cell, and non-perforated pipe, as needed,connected to storm drainage system.</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Filter Layer (optional)</td>
 
<td>Filter Layer (optional)</td>
<td>Sand filter layeris separated from base above and native soils with geotextile. Sand layer typically ASTM C33 gradation, 6 to 12 inches thick.</td>
+
<td>Sand filter layeris separated from base above and native soils with geotextile. Sand layer typically [http://www.astm.org/ ASTM] C33 gradation, 6 to 12 inches thick.</td>
 
<td>The sand layer may require a choker layer on surface to provide transition to base layerstone.</td>
 
<td>The sand layer may require a choker layer on surface to provide transition to base layerstone.</td>
 
</tr>
 
</tr>
Line 39: Line 39:
 
<tr>
 
<tr>
 
<td>Impermeable Liner</td>
 
<td>Impermeable Liner</td>
<td colspan="2">Use a minimum 30mil PVC liner covered by 12 ounce/square yard non-woven geotextile. EPDM andHDPE liner material is also acceptable.</td>
+
<td colspan="2">Use a minimum 30mil PVC liner covered by 12 ounce/square yard non-woven geotextile. [[Glossary|EPDM]] and [[Glossary|HDPE]] liner material is also acceptable.</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Observation Well</td>
 
<td>Observation Well</td>
<td colspan="2">Use a perforated 4 to 6 inch vertical PVC pipe (AASHTO M-252) with a lockable cap, installedflush with the surface (or under pavers).</td>
+
<td colspan="2">Use a perforated 4 to 6 inch vertical [[Glossary|PVC]] pipe (AASHTO M-252) with a lockable cap, installedflush with the surface (or under pavers).</td>
 
</tr>
 
</tr>
 
</table>
 
</table>

Revision as of 19:42, 4 February 2013

Table summarizing specifications for materials under the pavement surface.
Link to this table
Material
Specification
Notes
Bedding/choker layer
  • Pervious concrete: None
  • Porous asphalt: 1inch of AASHTO No. 57 stone
  • PICP: 2 inches of AASHTO No. 8 stone (MnDOT 3127FA-3)
Washed free of fines
Reservoir Layer
  • Pervious concrete: AASHTO No. 57 stone or per hydraulic design
  • Porous asphalt:AASHTO No. 2, 3, or 5 stone
  • PICP: 4 inches of AASHTO No. 57 base and AASHTO No.2, 3 or 4 stone subbase
Stone layer thickness based on the pavement structural and hydraulic requirements. Stonewashed and free of fines. Recommended minimum void ratio = 0.4.
Underdrain (optional) Use 4 to 6 inch diameter perforated PVC (AASHTO M-252) pipe or corrugated polyethylene pipe. Perforated pipe installed for the full length of the permeable pavement cell, and non-perforated pipe, as needed,connected to storm drainage system.
Filter Layer (optional) Sand filter layeris separated from base above and native soils with geotextile. Sand layer typically ASTM C33 gradation, 6 to 12 inches thick. The sand layer may require a choker layer on surface to provide transition to base layerstone.
Geotextile(optional) Comply with AASHTO M-288 Standard Specification for Geotextile Specification for Highway Applications, drainage and separation applications, Class I or II. Porous asphalt industry recommends non-woven geotextile.
Impermeable Liner Use a minimum 30mil PVC liner covered by 12 ounce/square yard non-woven geotextile. EPDM and HDPE liner material is also acceptable.
Observation Well Use a perforated 4 to 6 inch vertical PVC pipe (AASHTO M-252) with a lockable cap, installedflush with the surface (or under pavers).