Line 8: Line 8:
 
Best Management Practices (BMPs) to minimize erosion <br>
 
Best Management Practices (BMPs) to minimize erosion <br>
 
1. [https://stormwater.pca.state.mn.us/index.php?title=Erosion_prevention_practices| Erosion control BMPs]<br>
 
1. [https://stormwater.pca.state.mn.us/index.php?title=Erosion_prevention_practices| Erosion control BMPs]<br>
2. Schedule & effective methods to immediately stabilize soil<br>
+
2. [https://stormwater.pca.state.mn.us/index.php?title=Erosion_prevention_practices_-_temporary_seeding_and_stabilization| Schedule & effective methods to immediately stabilize soil]<br>
3. Energy dissipation at pipe outlets<br>
+
3. [https://stormwater.pca.state.mn.us/index.php?title=Sediment_control_practices_-_Outlet_energy_dissipation| Energy dissipation at pipe outlets]<br>
4. 100 foot or more buffer from a special or impaired water <br>
+
4. 100 foot or more buffer from a [https://stormwater.pca.state.mn.us/index.php?title=Special_Waters_and_Impaired_Waters| special or impaired water] <br>
 
5. Schedule to stabilize drainage ditches or swales<br>
 
5. Schedule to stabilize drainage ditches or swales<br>
 
6. Plan to route water around unstabilized areas<br>
 
6. Plan to route water around unstabilized areas<br>
Line 16: Line 16:
  
 
BMPs to minimize the discharge of sediment and other pollutants<br>
 
BMPs to minimize the discharge of sediment and other pollutants<br>
8. Downgradient perimeter control<br>
+
8. [https://stormwater.pca.state.mn.us/index.php?title=Sediment_control_practices_-_Perimeter_controls_for_disturbed_areas| Downgradient perimeter control]<br>
9. Storm drain inlet protection<br>
+
9. [https://stormwater.pca.state.mn.us/index.php?title=Sediment_control_practices_-_Storm_drain_inlet_protection| Storm drain inlet protection]<br>
 
10. Sediment control for temporary soil stockpiles<br>
 
10. Sediment control for temporary soil stockpiles<br>
11. Vehicle tracking BMPs<br>
+
11. [https://stormwater.pca.state.mn.us/index.php?title=Sediment_control_practices_-_Vehicle_tracking_BMPs| Vehicle tracking BMPs]<br>
 
12. Temporary sedimentation basins, if applicable<br>
 
12. Temporary sedimentation basins, if applicable<br>
 
13. 50 foot buffer maintained adjacent to surface waters or redundant sediment controls otherwise<br>
 
13. 50 foot buffer maintained adjacent to surface waters or redundant sediment controls otherwise<br>

Revision as of 19:25, 11 July 2017