Line 35: Line 35:
  
 
===Other===
 
===Other===
[[media:Environmental Good Housekeeping Reminder - Red Wing.pdf|Construction site good housekeeping reminder]] - City of Red Wing's tool to remind construction site owners/operators to maintain sites in compliance with their construction site stormwater runoff control regulatory mechanism
+
*[[media:Environmental Good Housekeeping Reminder - Red Wing.pdf|Construction site good housekeeping reminder]] - City of Red Wing's tool to remind construction site owners/operators to maintain sites in compliance with their construction site stormwater runoff control regulatory mechanism
[[media:Environmental Good Housekeeping THANK YOU - Red Wing.pdf|Construction site good housekeeping acknowledgement]] - City of Red Wing's  tool to acknowledge and appreciate sites that are in compliance with their construction site stormwater runoff control regulatory mechanism
+
*[[media:Environmental Good Housekeeping THANK YOU - Red Wing.pdf|Construction site good housekeeping acknowledgement]] - City of Red Wing's  tool to acknowledge and appreciate sites that are in compliance with their construction site stormwater runoff control regulatory mechanism

Revision as of 18:06, 10 January 2018

Construction site adjacent to water body

Introduction

Controlling sediment and other pollutants from construction sites is crucial to an effective stormwater management program. Minimum Control Measure (MCM) 4 of the MS4 General Permit requires permittees to have and enforce a construction site stormwater runoff control program to reduce the impacts of land disturbing activities to stormwater.

Requirements

The construction site stormwater runoff control program must include:

  • A regulatory mechanism that establishes erosion, sediment, and controls as stringent as the Construction Stormwater permit requirements for construction sites.
  • A site plan review procedure for conducting site plan reviews to ensure compliance with the construction stormwater runoff control regulatory mechanism.
  • Written procedures for the receipt and consideration of reports of noncomplaince at construction sites received from the public.
  • Construction site inspection procedures for inspecting public and private construction sites. The procdures should include: procedures for identifying and prioritizing sites for inspections, the frequency of site inspections, the name or title of the person responsible for inspections, and a checklist or other written means to document site inspections.
  • Enforcement Response Procedures.
  • Documentation as described here.

Resources

Click on the blue links above in the "Requirements" section to get more information and resources specific to those permit requirements. In addition, all resources related to MCM 4 are below.

Fact sheets and guidance documents

Documentation and tracking templates

Checklists

Example Procedures