==MS4 General Permit requirements for MCM 4== | ==MS4 General Permit requirements for MCM 4== | ||
The construction site stormwater runoff control program must include: | The construction site stormwater runoff control program must include: | ||
− | :*A regulatory mechanism that establishes erosion, sediment, and controls as stringent as the [https://stormwater.pca.state.mn.us/index.php/Construction_stormwater_permit Construction Stormwater permit] requirements for construction sites. | + | :*A regulatory mechanism that establishes erosion, sediment, and waste controls as stringent as the [https://stormwater.pca.state.mn.us/index.php/Construction_stormwater_permit Construction Stormwater permit] requirements for construction sites. |
:*A [[site plan review procedure]] for conducting site plan reviews to ensure compliance with the construction stormwater runoff control regulatory mechanism. | :*A [[site plan review procedure]] for conducting site plan reviews to ensure compliance with the construction stormwater runoff control regulatory mechanism. | ||
:*Written [[#Example Procedures|procedures]] for the receipt and consideration of reports of noncomplaince at construction sites received from the public. | :*Written [[#Example Procedures|procedures]] for the receipt and consideration of reports of noncomplaince at construction sites received from the public. | ||
− | :*[[Construction site inspection]] procedures for inspecting public and private construction sites. The | + | :*[[Construction site inspection]] procedures for inspecting public and private construction sites. The procedures should include: procedures for identifying and prioritizing sites for inspections, the frequency of site inspections, the name or title of the person responsible for inspections, and a checklist or other written means to document site inspections. |
:*[[Enforcement response procedures]] to compel compliance with the construction stormwater runoff control regulatory mechanism. | :*[[Enforcement response procedures]] to compel compliance with the construction stormwater runoff control regulatory mechanism. | ||
:*Documentation as described [https://stormwater.pca.state.mn.us/index.php?title=Documentation_requirements_and_documents_to_retain_under_the_MS4_permit here]. | :*Documentation as described [https://stormwater.pca.state.mn.us/index.php?title=Documentation_requirements_and_documents_to_retain_under_the_MS4_permit here]. |
Controlling sediment and other pollutants from construction sites is crucial to an effective stormwater management program. Minimum Control Measure (MCM) 4 of the MS4 General Permit requires permittees to have and enforce a construction site stormwater runoff control program to reduce the impacts of land disturbing activities to stormwater.
The construction site stormwater runoff control program must include:
Click on the blue links above in the "MS4 General Permit requirements" section to get more information and resources specific to those permit requirements. In addition, all resources related to MCM 4 are below.