<td>Salvage cost ($/acre) x Affected Area (acre)</td>
 
<td>Salvage cost ($/acre) x Affected Area (acre)</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Clearing & grubbing</td>
 
<td>Clearing & grubbing</td>
 
<td>Clearing Cost ($/acre) x Affected Area (acre)</td>
 
<td>Clearing Cost ($/acre) x Affected Area (acre)</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
<td rowspan=2>Site Formation</td>
+
<td rowspan=3>Site Formation</td>
 
<td>Excavation / grading</td>
 
<td>Excavation / grading</td>
 
<td>8-ft Depth Excavation Cost ($/acre) x Area (acre)</td>
 
<td>8-ft Depth Excavation Cost ($/acre) x Area (acre)</td>
Line 38: Line 36:
 
<td>Excavation Cost x (% of Material to be hauled away)</td>
 
<td>Excavation Cost x (% of Material to be hauled away)</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td rowspan=2>Structural Components</td>
 
<td rowspan=2>Structural Components</td>
Line 45: Line 42:
 
<td rowspan=2>Pipes, catchbasins, manholes, valves</td>
 
<td rowspan=2>Pipes, catchbasins, manholes, valves</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Outlet structure</td>
 
<td>Outlet structure</td>
 
<td>($/structure)</td>
 
<td>($/structure)</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td rowspan=2>Site Restoration</td>
 
<td rowspan=2>Site Restoration</td>
Line 57: Line 52:
 
<td rowspan=2>Tree protection, soil amendments, seed bed preparation, trails</td>
 
<td rowspan=2>Tree protection, soil amendments, seed bed preparation, trails</td>
 
</tr>
 
</tr>
 
+
<tr>
 +
<td>Planting / transplanting</td>
 +
<td>Planting Cost ($/acre) x Planted Area (acre)</td>
 +
</tr>
 
<tr>
 
<tr>
 
<td rowspan=5>Annual Operation, Maintenance, and Inspection</td>
 
<td rowspan=5>Annual Operation, Maintenance, and Inspection</td>
Line 64: Line 62:
 
<td rowspan=5>Vegetation maintenance, cleaning of structures</td>
 
<td rowspan=5>Vegetation maintenance, cleaning of structures</td>
 
</tr>
 
</tr>
 
 
 
<tr>
 
<tr>
 
<td>Sediment removal</td>
 
<td>Sediment removal</td>
Line 81: Line 77:
 
<td>Mowing Cost ($) x Mowing Frequency (4 / 1 yr)</td>
 
<td>Mowing Cost ($) x Mowing Frequency (4 / 1 yr)</td>
 
</tr>
 
</tr>
 +
 
</table>
 
</table>
 +
 +
  
 
[[category:table]]
 
[[category:table]]

Revision as of 21:11, 15 February 2013

This table shows Cost components for stormwater ponds

(Link to this table)

Implementation Stage Primary Cost Components Basic Cost Estimate Other Considerations
Site Preparation Tree & plant protection Protection Cost ($/acre) x Affected Area (acre) Removal of existing structures, topsoil removal and stockpiling
Topsoil salvage Salvage cost ($/acre) x Affected Area (acre)
Clearing & grubbing Clearing Cost ($/acre) x Affected Area (acre)
Site Formation Excavation / grading 8-ft Depth Excavation Cost ($/acre) x Area (acre) Soil & rock fill material, tunneling
Hauling material offsite Excavation Cost x (% of Material to be hauled away)
Structural Components Inlet structure ($/structure) Pipes, catchbasins, manholes, valves
Outlet structure ($/structure)
Site Restoration Seeding or sodding Seeding Cost ($/acre) x Seeded Area (acre) Tree protection, soil amendments, seed bed preparation, trails
Planting / transplanting Planting Cost ($/acre) x Planted Area (acre)
Annual Operation, Maintenance, and Inspection Debris removal Removal Cost ($/acre) x Area (acre) x Frequency (2 / 1yr) Vegetation maintenance, cleaning of structures
Sediment removal Removal Cost ($/acre) x Area (acre) x Frequency (1 / 5yr)
Gate / valve operation Operation Cost ($) x Operation Frequency (2 / 1 yr)
Inspection
Mowing Mowing Cost ($) x Mowing Frequency (4 / 1 yr)