m (1 revision)
Line 8: Line 8:
  
  
'''The next section in the chapter addressing stormwater ponds is Links.  To proceed to that section, click [[Cost-benefit considerations for stormwater ponds|here]]'''.
 
 
'''To return to the previous section, click [[Training, certification and accreditation for stormwater ponds|here]].'''
 
  
 
[[category:BMP]]
 
[[category:BMP]]

Revision as of 21:47, 15 February 2013

Costs for ponds typically include costs for embankment, riser and spillway structures, outfall protection, vegetative stabilization, excavation, and grading. Additional costs for site preparation can include soil amendments, precision grading, plant materials and creation of occluding layers in coarse-textured soil types if wetlands systems must be created on upland sites due to project constraints. Project costs can be lowered if existing pre-construction site conditions are carefully considered and isolated areas with hydric soils contained within the footprint of the project are utilized as stormwater management facilities.

Additional maintenance costs will be incurred until the establishment of the wetland ecosystem. Invasive plants must be culled and dead plants replaced. The outlet structure may have to be adjusted, based on seasonal observations, to achieve the proper water surface in the pond.


Construction and maintenance costs

Chapter 6 outlines a cost estimation method which site planners could use to compare the relative construction and maintenance costs for structural best management practices. These curves are excellent for purposes of comparison; however, it is recommended that construction and maintenance budgets should be based on site specific information. Utilizing Table 12.POND.5 and the cost estimation worksheet in Appendix D, will allow designers to avoid over or under estimation of fixed costs. Table 12.POND.5 lists the specific site components that are specific to stormwater ponds. Not included in this table are those cost items that are common to all construction projects, such as mobilization, traffic control, erosion and sediment control, permitting, etc.