Line 16: | Line 16: | ||
:'''Practice Designer''': | :'''Practice Designer''': | ||
===Design Considerations=== | ===Design Considerations=== | ||
+ | :'''Design Cost''': | ||
+ | |||
+ | :'''Design Year''': | ||
+ | Narrative description of contributing drainage area, including description of land use | ||
+ | |||
+ | List of existing impairments and TMDLs that the BMP drains to | ||
:'''Total Contributing Drainage Area''' (acres): | :'''Total Contributing Drainage Area''' (acres): | ||
Line 23: | Line 29: | ||
:'''Downstream Structural Best Management Practice''': | :'''Downstream Structural Best Management Practice''': | ||
− | |||
− | :List of | + | :'''Design Pollutant Removal Performance''': |
+ | Discussion of why that particular pretreatment system was chosen for that project location, specific rationale (e.g., site characteristics, ease of maintenance, etc.) | ||
+ | |||
+ | Description of sizing criteria used to design pretreatment practice | ||
+ | ===Construction Considerations=== | ||
+ | :'''Construction Cost''': | ||
+ | |||
+ | :'''Construction Year''': | ||
+ | Description of adverse site conditions/other construction challenges encountered during installation | ||
+ | ===Maintenance Considerations=== | ||
+ | List or description of types of maintenance practices used for the upkeep of the pretreatment system | ||
+ | :'''Maintenance Frequency''': | ||
+ | |||
+ | :'''Maintenance Cost''': | ||
+ | |||
+ | :'''Disposal Cost''': | ||
+ | Description of maintenance challenges, discussion of ease of maintenance | ||
+ | |||
+ | Discussion of any additional maintenance considerations | ||
+ | ===Results=== | ||
+ | :'''Measured or Estimated Pollutant Removal Performance''': | ||
+ | Discussion of how the performance was measured or estimated | ||
+ | |||
+ | For proprietary practices, did were the manufacturer claims met? | ||
+ | |||
+ | Discussion of lessons learned through the implementation of this pretreatment practice |
Narrative description of pretreatment project
Narrative description of contributing drainage area, including description of land use
List of existing impairments and TMDLs that the BMP drains to
Discussion of why that particular pretreatment system was chosen for that project location, specific rationale (e.g., site characteristics, ease of maintenance, etc.)
Description of sizing criteria used to design pretreatment practice
Description of adverse site conditions/other construction challenges encountered during installation
List or description of types of maintenance practices used for the upkeep of the pretreatment system
Description of maintenance challenges, discussion of ease of maintenance
Discussion of any additional maintenance considerations
Discussion of how the performance was measured or estimated
For proprietary practices, did were the manufacturer claims met?
Discussion of lessons learned through the implementation of this pretreatment practice