Line 37: | Line 37: | ||
Discussion of any additional maintenance considerations | Discussion of any additional maintenance considerations | ||
===Results=== | ===Results=== | ||
+ | Discussion of how the performance was measured or estimated | ||
:'''Measured or Estimated Pollutant Removal Performance''': | :'''Measured or Estimated Pollutant Removal Performance''': | ||
− | |||
− | |||
For proprietary practices, did were the manufacturer claims met? | For proprietary practices, did were the manufacturer claims met? | ||
Discussion of lessons learned through the implementation of this pretreatment practice | Discussion of lessons learned through the implementation of this pretreatment practice |
Narrative description of pretreatment project
Narrative description of contributing drainage area, including description of land use
List of existing impairments and TMDLs that the BMP drains to
Discussion of why that particular pretreatment system was chosen for that project location, specific rationale (e.g., site characteristics, ease of maintenance, etc.)
Description of sizing criteria used to design pretreatment practice
Description of adverse site conditions/other construction challenges encountered during installation
List or description of types of maintenance practices used for the upkeep of the pretreatment system
Description of maintenance challenges, discussion of ease of maintenance
Discussion of any additional maintenance considerations
Discussion of how the performance was measured or estimated
For proprietary practices, did were the manufacturer claims met?
Discussion of lessons learned through the implementation of this pretreatment practice