m |
m |
||
Line 140: | Line 140: | ||
*<span title="practices are designed to prevent or minimize loss of eroded soil at a site> [https://stormwater.pca.state.mn.us/index.php?title=Sediment_control_practices '''sediment control''']</span> | *<span title="practices are designed to prevent or minimize loss of eroded soil at a site> [https://stormwater.pca.state.mn.us/index.php?title=Sediment_control_practices '''sediment control''']</span> | ||
*settling ponds | *settling ponds | ||
− | *<span title="Pretreatment settling devices are flow-through structures or devices, proprietary or non-proprietary, above or below ground, where settling is the primary mechanism of pollutant removal. Some of these devices also provide treatment in addition to settling by utilizing a variety of mechanisms to separate and capture pollutant-laden material."> '''settling device'''</span> | + | *<span title="Pretreatment settling devices are flow-through structures or devices, proprietary or non-proprietary, above or below ground, where settling is the primary mechanism of pollutant removal. Some of these devices also provide treatment in addition to settling by utilizing a variety of mechanisms to separate and capture pollutant-laden material."> '''settling device'''</span> (for pretreatment) |
*<span title="The amount of time it takes for a sediment suspended in liquid to sink and collect at the bottom."> '''settling time'''</span> | *<span title="The amount of time it takes for a sediment suspended in liquid to sink and collect at the bottom."> '''settling time'''</span> | ||
*short-circuiting | *short-circuiting |
This page lists standard definitions used in hover boxes throughout this manual. Hover boxes allow the user to hover over bolded text and see a definition for that text.