m |
m |
||
Line 105: | Line 105: | ||
</table> | </table> | ||
− | [[category: | + | [[category:Rain harvest table]] |
Harvested stormwater site survey and information worksheet
Link to this table
Item | Comments / notes | Used |
---|---|---|
Storm sewer maps | ||
Topographic maps | ||
Floodplain maps | ||
Soil maps | ||
Karst maps | ||
Highway maps | ||
Hazardous waste site maps | ||
Runoff monitoring data | ||
Hydraulic analyses | ||
permits | ||
Soil borings/geotechnical analyses | ||
Site plans | ||
Gopher State One call | ||
Storm sewer surveys | ||
Presence of wells | ||
Building plans | ||
Precipitation data | ||
Existing information on stormwater ponds | ||
Existing information on storage tanks |