m
m
Line 42: Line 42:
 
<font size=1><sup>1</sup>LS = lump sum; SF = square foot</font size>
 
<font size=1><sup>1</sup>LS = lump sum; SF = square foot</font size>
  
[[category:Table]]
+
<noinclude>
 +
[[category:Sediment control table]]
 +
</noinclude>

Revision as of 19:51, 13 April 2020

Average bid prices for Specification Year 2014. Source: MnDOT
Link to this table

Bid Item Item Description Units1 Average Price
2105.601/00045 Temporary Stream Diversion System LS $26,292.50
2452.601/00011 Steel Sheet Piling (Temporary) LS $107,614.29
2452.618/00011 Steel Sheet Piling (Temporary) SF $16.75
2573.504/00010 Sandbag Barrier SF $10.55
2105.601/00010 Dewatering LS $65,587.94

1LS = lump sum; SF = square foot