Line 5: | Line 5: | ||
! Permit requirement !! Schedule | ! Permit requirement !! Schedule | ||
|- | |- | ||
− | | Section 12. Stormwater Pollution Prevention Program (SWPPP) | + | | Section 12. Stormwater Pollution Prevention Program (SWPPP)<br/>Document |
− | Document | ||
*Submit the SWPPP Document completed in accordance with | *Submit the SWPPP Document completed in accordance with | ||
Section 12 | Section 12 |
Permit requirement | Schedule |
---|---|
Section 12. Stormwater Pollution Prevention Program (SWPPP) Document
Section 12 |
date. |
Section 13. Stormwater Pollution Prevention Program (SWPPP)
Sections 14 - 23 into current SWPPP. |
coverage is extended, unless other timelines have been specifically established in the General Permit and identified below. |
Section 19. Construction Site Stormwater Runoff Control
Control program, including revisions to regulatory mechanism(s), if necessary.
mechanism(s), if necessary, to be at least as stringent as the requirements for erosion, sediment, and waste controls described in the CSW Permit. |
coverage is extended.
Permit (expected issuance date of the CSW Permit is August 1, 2023). |
Section 21. Pollution Prevention/Good Housekeeping for
Municipal Operations
inspections.
|
|
Section 22. Discharges to Impaired Waters with a USEPAApproved TMDL that includes an Applicable WLA
and temperature in Section 22. |
With each annual report.
coverage is extended. |
Section 25. Annual Assessment, Annual Reporting, and
Recordkeeping
|
|