Line 68: | Line 68: | ||
*<i>Develop, implement, and enforce an Illicit Discharge Detection<br/>and Elimination Program. | *<i>Develop, implement, and enforce an Illicit Discharge Detection<br/>and Elimination Program. | ||
| | | | ||
− | *Within 12 months of the date General Permit<br/> | + | *Within 12 months of the date General Permit coverage is<br/>extended. |
|- | |- | ||
|'''Section 19. Construction Site Stormwater Runoff Control''' | |'''Section 19. Construction Site Stormwater Runoff Control''' | ||
Line 74: | Line 74: | ||
*<i>When the CSW Permit is reissued, revise regulatory<br/>mechanism(s), if necessary, to be at least as stringent as the<br/>requirements for erosion, sediment, and waste controls described<br/>in the CSW Permit. | *<i>When the CSW Permit is reissued, revise regulatory<br/>mechanism(s), if necessary, to be at least as stringent as the<br/>requirements for erosion, sediment, and waste controls described<br/>in the CSW Permit. | ||
| | | | ||
− | *Within 12 months of the date General Permit<br/> | + | *Within 12 months of the date General Permit coverage is<br/>extended. |
*Within 12 months of the issuance date of the CSW Permit<br/>(expected issuance date of the CSW Permit is August 1, 2023). | *Within 12 months of the issuance date of the CSW Permit<br/>(expected issuance date of the CSW Permit is August 1, 2023). | ||
|- | |- | ||
Line 86: | Line 86: | ||
*<i>Conduct pond and outfall inspections. | *<i>Conduct pond and outfall inspections. | ||
| | | | ||
− | * | + | *Each calendar year |
− | * | + | *Prior to the expiration date of the General Permit. |
|- | |- | ||
|'''Section 22. Discharges to Impaired Waters with a USEPA-<br/>Approved TMDL that includes an Applicable WLA''' | |'''Section 22. Discharges to Impaired Waters with a USEPA-<br/>Approved TMDL that includes an Applicable WLA''' | ||
Line 94: | Line 94: | ||
| | | | ||
*With each annual report. | *With each annual report. | ||
− | *Within 12 months of the date General Permit<br/> | + | *Within 12 months of the date General Permit coverage is<br/>extended. |
|- | |- | ||
|'''Section 23. Alum or Ferric Chloride Phosphorus Treatment<br/>Systems (if applicable)''' | |'''Section 23. Alum or Ferric Chloride Phosphorus Treatment<br/>Systems (if applicable)''' | ||
*<i>Meet requirements for treatment systems in Section 23 | *<i>Meet requirements for treatment systems in Section 23 | ||
| | | | ||
− | *Within 12 months of the date General Permit<br/> | + | *Within 12 months of the date General Permit coverage is<br/>extended. |
|- | |- | ||
|'''Section 25. Annual Assessment, Annual Reporting, and<br/>Recordkeeping''' | |'''Section 25. Annual Assessment, Annual Reporting, and<br/>Recordkeeping''' |
Permit requirement | Schedule |
---|---|
Section 12. Stormwater Pollution Prevention Program (SWPPP) Document.
|
|
Section 13. Stormwater Pollution Prevention Program (SWPPP)
|
|
Section 19. Construction Site Stormwater Runoff Control
|
|
Section 21. Pollution Prevention/Good Housekeeping for Municipal Operations
|
|
Section 22. Discharges to Impaired Waters with a USEPA- Approved TMDL that includes an Applicable WLA
|
|
Section 25. Annual Assessment, Annual Reporting, and Recordkeeping
|
|
Permit requirement | Schedule |
---|---|
Section 10. New Permittee Applicants
|
|
Section 13. Stormwater Pollution Prevention Program (SWPPP)
|
|
Section 14. Mapping
|
|
Section 18. Illicit Discharge Detection and Elimination
|
|
Section 19. Construction Site Stormwater Runoff Control
|
|
Section 20. Post-Construction Stormwater Management
|
|
Section 21. Pollution Prevention/Good Housekeeping for Municipal Operations
|
|
Section 22. Discharges to Impaired Waters with a USEPA- Approved TMDL that includes an Applicable WLA
|
|
Section 23. Alum or Ferric Chloride Phosphorus Treatment Systems (if applicable)
|
|
Section 25. Annual Assessment, Annual Reporting, and Recordkeeping
|
|