m |
m |
||
Line 25: | Line 25: | ||
<td rowspan=8>Horizontal</td> | <td rowspan=8>Horizontal</td> | ||
<td>Public supply well</td> | <td>Public supply well</td> | ||
− | <td>100 for sensitive wells; 50 for others</td> | + | <td>100 for sensitive wells; 50 for others<sup>3</sup></td> |
<td>Requirement</td> | <td>Requirement</td> | ||
<td></td> | <td></td> | ||
Line 68: | Line 68: | ||
</table> | </table> | ||
<font size=1><sup>1</sup> Required under the Construction Stormwater General Permit<br> | <font size=1><sup>1</sup> Required under the Construction Stormwater General Permit<br> | ||
− | <sup>2</sup> Minimum with slopes directed away from the building</font size> | + | <sup>2</sup> Minimum with slopes directed away from the building |
+ | <sup>3</sup>If treating an average of 10,000 gallons per day; otherwise separation distance is 300 feet</font size> |
Required and recommended minimum vertical and horizontal separation distances. This represents the minimum distance from the infiltration practice to the structure of concern. If the structure is above-ground, the distance is measured from the edge of the BMP to the structure. If the structure is underground, the vertical separation distance represents the distance from the point of infiltration through the bottom of the system to the structure, while the horizontal separation (often called setback) distance is the shortest distance from the edge of the system to the structure.
Link to this table
Structure | Distance (feet) | Requirement or recommendation | Note(s) | |
---|---|---|---|---|
Vertical | Saturated soil | 3 | Requirement1 | |
Bedrock | 3 | Requirement1 | ||
Horizontal | Public supply well | 100 for sensitive wells; 50 for others3 | Requirement | |
Building/structure/property line2 | 10 | Recommended | ||
Surface water | none unless local requirements exist | If nearby stream is impaired for chloride, see [1] | ||
Septic system | 35 | Recommended | ||
Contaminated soil/groundwater | No specific distance. Infiltration must not mobilize contaminants. | |||
Slope | 200 | Recommended | from toe of slope >= 20% | |
Karst | 1000 up-gradient 100 down-gradient | Requirement1 | Active karst |
1 Required under the Construction Stormwater General Permit
2 Minimum with slopes directed away from the building
3If treating an average of 10,000 gallons per day; otherwise separation distance is 300 feet