m
m
Line 37: Line 37:
 
<tr>
 
<tr>
 
<td>< 75%</td>
 
<td>< 75%</td>
<td>(0.25 V<sub>wq</sub>)/ D<sub>max</sub></td>
+
<td>(0.25 V<sub>wq</sub>) / D<sub>max</sub></td>
 
<td>0.066 V<sub>wq</sub></td>
 
<td>0.066 V<sub>wq</sub></td>
 
</tr>
 
</tr>
 
</table>
 
</table>
 
[[category:table]]
 
[[category:table]]

Revision as of 19:41, 18 March 2013

Settling chamber surface area for sand filters and perimeter sand filters.
Link to this table

Sand Filter
Maximum Ponding Depth (feet)
< 4
4 to 10
Impervious ≥ 75% (0.25 Vwq) / Dmax (0.25 Vwq) / Dmax
< 75% (0.25 Vwq) / Dmax 0.066 Vwq
Perimeter Sand Filter Maximum Ponding Depth (feet)
<7.5 8 to 10
Impervious ≥ 75% (0.5 Vwq) / Dmax (0.5 Vwq) / Dmax
< 75% (0.25 Vwq) / Dmax 0.066 Vwq