<center><font size=3>'''Stormwater pond cost estimate worksheet.'''</font size><br>
+
<center><font size=3>'''Stormwater pond cost estimate worksheet'''</font size><br>
  
 
Link to this [[Stormwater pond cost estimate worksheet|table]]</center>
 
Link to this [[Stormwater pond cost estimate worksheet|table]]</center>
Line 8: Line 8:
 
<td colspan=4> </td>
 
<td colspan=4> </td>
 
</tr>
 
</tr>
 +
 
<tr>
 
<tr>
 
<td>Owner</td>
 
<td>Owner</td>
Line 16: Line 17:
 
<td colspan=4> </td>
 
<td colspan=4> </td>
 
</tr>
 
</tr>
 +
 
<tr>
 
<tr>
 
<td>Project Number</td>
 
<td>Project Number</td>
 
<td colspan=4> </td>
 
<td colspan=4> </td>
 
</tr>
 
</tr>
 +
 
<tr>
 
<tr>
 
<td>Date</td>
 
<td>Date</td>
Line 47: Line 50:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 +
 
<tr>
 
<tr>
 
<td>Clear and grub brush</td>
 
<td>Clear and grub brush</td>
Line 54: Line 58:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 +
 
<tr>
 
<tr>
 
<td>Tree protection - temp. fence</td>
 
<td>Tree protection - temp. fence</td>
Line 75: Line 80:
 
<th colspan=5>'''Site Formation'''</th>
 
<th colspan=5>'''Site Formation'''</th>
 
</tr>
 
</tr>
 +
 
<tr>
 
<tr>
 
<td>Excavation - 8' depth</td>
 
<td>Excavation - 8' depth</td>
Line 82: Line 88:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
<tr>
+
 
 
<tr>
 
<tr>
 
<td>Grading</td>
 
<td>Grading</td>
Line 90: Line 96:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 +
 
<tr>
 
<tr>
 
<td>Hauling off-site - 8' depth</td>
 
<td>Hauling off-site - 8' depth</td>
Line 162: Line 169:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 +
 
<tr>
 
<tr>
 
<td colspan=4>Subtotal</td>
 
<td colspan=4>Subtotal</td>
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 +
 
<tr>
 
<tr>
 
<td colspan=4>Apply MN Location Factor</td>
 
<td colspan=4>Apply MN Location Factor</td>
Line 238: Line 247:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 +
 
<tr>
 
<tr>
 
<td>Inspection</td>
 
<td>Inspection</td>
Line 354: Line 364:
  
  
[[category:table]]
+
[[category:Table]]

Revision as of 13:52, 19 March 2013

Stormwater pond cost estimate worksheet
Link to this table
Project Title
Owner
Location
Project Number
Date
Description Units Quantity Unit Cost Total Estimated Price
Site Preparation
Tree removal - up to 12" diameter each $350.00 $0.00
Clear and grub brush square yard $1.50 $0.00
Tree protection - temp. fence lineal foot $3.00 $0.00
Topsoil - 6" depth, salvage on site square yard $4.50 $0.00
Site Formation
Excavation - 8' depth square yard $10.00 $0.00
Grading square yard $1.50 $0.00
Hauling off-site - 8' depth square yard $10.00 $0.00
Structural Components
Inlet structure each $2,000.00 $0.00
Overflow structure each $3,500.00 $0.00
Site Restoration
Sod - above vegetative bench square yard $4.50 $0.00
Soil preparation square yard $5.00 $0.00
Seeding - vegetative bench square yard $0.50 $0.00
Mulch square yard $2.00 $0.00
Subtotal $0.00
10% Contingencies $0.00
Subtotal $0.00
Apply MN Location Factor $0.00
TAL CONSTRUCTION COST $0.00
Annual Operation and Maintenance
Debris removal per visit $100.00 $0.00
Remove invasive plants per visit $500.00 $0.00
Replant wetland vegetation per plant $10.00 $0.00
Repair erosion square yard $75.00 $0.00
Sediment removal and disposal cubic yard $10.00 $0.00
Mow per visitt $150.00 $0.00
Gate / valve operation per visit $125.00 $0.00
Inspection per visit $125.00 $0.00
Subtotal $0.00
Apply MN Location Factor $0.00
TOTAL ANNUAL O&M COST $0.00
Minnesota Location Factors
Bemidji 0.963
Brainerd 1.003
Detroit Lakes 0.962
Duluth 0.991
Mankato 0.990
Bemidji 0.963
Minneapolis 1.035
Rochester 0.983
St. Paul 1.000
St. Cloud 1.002
Thief River Falls 1.042
Willmar 0.961
Windom 0.935


Note: Suggested unit costs are based on RS Means prices for Spring, 2005, then factored into an area basis based on typical design features for Constructed Wetlands BMPs. To be used for preliminary cost estimation