Line 14: Line 14:
  
 
:d. all <span title="Any lake, river, stream or wetland that receives stormwater discharges from an MS4.">'''receiving waters'''</span>. [[https://www.revisor.mn.gov/rules/7090/ Minn. R. 7090]]</big>
 
:d. all <span title="Any lake, river, stream or wetland that receives stormwater discharges from an MS4.">'''receiving waters'''</span>. [[https://www.revisor.mn.gov/rules/7090/ Minn. R. 7090]]</big>
 +
 +
<noinclude>
 +
[[Category:2020 MS4 General Permit]]
 +
</noinclude>

Revision as of 21:19, 27 September 2021

Section 14 Mapping

14.1

Mapping. [Minn. R. 7090]

14.2

New permittees must develop, and existing permittees must update, as necessary, a storm sewer system map that depicts the following:

a. the permittee's entire MS4 as a goal, but at a minimum, all pipes 12 inches or greater in diameter, including stormwater flow direction in those pipes;
b. outfalls, including a unique identification (ID) number assigned by the permittee, and an associated geographic coordinates;
c. structural stormwater BMPs that are part of the permittee's MS4; and
d. all receiving waters. [Minn. R. 7090]