m |
m (→Box 15) |
||
Line 180: | Line 180: | ||
[MIDS design sequence flow chart - Box 17 No] | [MIDS design sequence flow chart - Box 17 No] | ||
+ | |||
+ | ==Box 16== | ||
+ | |||
+ | ==Box 17== | ||
+ | |||
+ | ==Box 18== | ||
+ | |||
+ | ==Box 19== | ||
+ | |||
+ | ==Box 20== | ||
+ | |||
+ | ==Box 21== | ||
+ | |||
+ | ==Box 22== | ||
+ | |||
+ | ==Box 23== | ||
+ | |||
+ | ==Box 24== | ||
+ | |||
+ | ==Box 25== | ||
+ | |||
+ | ==Box 26== | ||
+ | |||
+ | ==Box 27== | ||
+ | |||
+ | ==Box 28== | ||
+ | |||
+ | ==Box 29== | ||
+ | |||
+ | ==Box 30== | ||
+ | |||
+ | ==Box 31== | ||
+ | |||
+ | ==Box 32== | ||
+ | |||
+ | ==Box 33== | ||
+ | |||
+ | ==Box 34== | ||
+ | |||
+ | ==Box 35== | ||
+ | |||
+ | ==Box 36== | ||
+ | |||
+ | ==Box 37== | ||
+ | |||
+ | ==Box 38== | ||
+ | |||
+ | ==Box 39== | ||
+ | |||
+ | ==Box 40== | ||
+ | |||
+ | ==Box 41== | ||
+ | |||
+ | ==Box 42== | ||
+ | |||
+ | ==Box 43== | ||
+ | |||
+ | ==Box 44== | ||
+ | |||
+ | ==Box 45== | ||
+ | |||
+ | ==Box 46== | ||
+ | |||
+ | ==Box 47== | ||
+ | |||
+ | ==Box 48== | ||
+ | |||
+ | ==Box 49== | ||
+ | |||
+ | ==Box 50== | ||
+ | |||
+ | ==Box 51== | ||
+ | |||
+ | ==Box 52== | ||
+ | |||
+ | ==Box 53== | ||
+ | |||
+ | ==Box 54== | ||
+ | |||
+ | ==Box 55== | ||
+ | |||
+ | ==Box 56== | ||
+ | |||
+ | ==Box 57== | ||
+ | |||
+ | ==Box 58== | ||
+ | |||
+ | ==Box 59== | ||
+ | |||
+ | ==Box 60== | ||
+ | |||
+ | ==Box 61== | ||
+ | |||
+ | ==Box 62== | ||
+ | |||
+ | ==Box 63== | ||
+ | |||
+ | ==Box 64== | ||
+ | |||
+ | ==Box 65== | ||
==PREVIOUS QUESTION and ANSWER:== | ==PREVIOUS QUESTION and ANSWER:== |
Did you gather the site information necessary to proceed through the flow chart?
Prior to using the flow chart, gather the following preliminary information.
Does project create one acre or more of new and/or fully reconstructed impervious surfaces?
PREVIOUS QUESTION and ANSWER: The previous question defined the performance goals.
MIDS PERFORMANCE GOAL DOES NOT APPLY
The project creates less than 1 acre of impervious surface.
Is the project linear?
PREVIOUS QUESTION and ANSWER: Does project create one acre or more of new and/or fully reconstructed impervious surfaces? Answer - Yes
Are there constraints due to lack of available ROW, off site drainage and/or rate control requirements?
Is Flexible Treatment Option (FTO) 2 feasible?
[ Box 57 Yes]
[ Box 10 No]
PREVIOUS QUESTION and ANSWER: Are there restraints due to lack of available right-of-way, off-site drainage, and/or rate control requirements? Answer: Yes
Select Flexible treatment Option 2. You have completed the flow chart.
Applicant attempts to comply with the following conditions:
PREVIOUS STEP: It was determined that the site is linear, there are constraints due to lack of right-of-way or off/site drainage and/or rate control requirements, and a reasonable effort to acquire all of the right-of-way cannot be made.
Off-site mitigation (including banking or cash or treatment on another project, as determined by the local authority) equivalent to the volume reduction performance goal can be used in areas selected in the following order of preference:
PREVIOUS QUESTION: It was determined that Flexible Treatment Option 2 is not feasible.
Are there zoning and land use requirements that make the Performance Goal not feasible?
PREVIOUS QUESTION and ANSWER:
or
Is BMP relocation feasible
PREVIOUS QUESTION and ANSWER: Are there zoning and land use requirements that make the Performance Goal not feasible? Answer: Yes
Is Flexible Treatment Option (FTO) 1 feasible?
[ Box 61 Yes]
PREVIOUS QUESTION and ANSWER: Is BMP relocation feasible - Answer: No
Applicant attempts to comply with the following conditions:
Is Flexible Treatment Option (FTO) 2 feasible?
[ Box 54 Yes]
==PREVIOUS QUESTION and ANSWER: Is Flexible Treatment Option (FTO) 1 feasible? - Answer: No
Applicant attempts to comply with the following conditions:
Is the site located in a DWSMA (Drinking Water Supply Management Area), wellhead protection area, or within 200 feet of a drinking water well?
[ Box 16 Yes]
[MIDS design sequence flow chart - Box 17 No]
or
A drinking water supply management area (DWSMA) is the Minnesota Department of Health (MDH) approved surface and subsurface area surrounding a public water supply well that completely contains the scientifically calculated wellhead protection area and is managed by the entity identified in a wellhead protection plan. The boundaries of the drinking water supply management area are delineated by identifiable physical features, landmarks or political and administrative boundaries.