==Investigation for Low Infiltration Capacity Soils== | ==Investigation for Low Infiltration Capacity Soils== | ||
− | Soil testing is recommended for all proposed stormwater facilities that plan to have a recharge or infiltration component to their design. Testing can be less rigorous than that for karst areas or sites with shallow bedrock and soils. The purpose of the testing is to identify and confirm the soil characteristics and determine their suitability, if any, for infiltration practices. The guidelines outlined below should not be interpreted as all-inclusive. The design of any subsurface investigation should reflect the size and complexity of the proposed project. | + | Soil testing is recommended for all proposed stormwater facilities that plan to have a recharge or infiltration component to their design. Testing can be less rigorous than that for [[Karst|karst]] areas or sites with [[Shallow soils and shallow depth to bedrock|shallow bedrock and soils]]. The purpose of the testing is to identify and confirm the soil characteristics and determine their suitability, if any, for [[Glossary#I|infiltration]] practices. The guidelines outlined below should not be interpreted as all-inclusive. The design of any subsurface investigation should reflect the size and complexity of the proposed project. |
===Location of Borings=== | ===Location of Borings=== | ||
− | Borings should be located in order to provide representative area coverage of the of the proposed BMP facilities. The location of borings should be | + | Borings should be located in order to provide representative area coverage of the of the proposed BMP facilities. The location of borings should be |
− | * | + | *in each geologic unit present, as mapped by the [http://www.mngs.umn.edu/ Minnesota Geological Survey] (MGS) and [http://www.usgs.gov/ U.S. Geological Survey] (USGS) and local county records; |
− | * | + | *near the edges and center of the proposed practice and spaced at equal distances from one another; and |
− | * | + | *near any areas identified as anomalies from any existing geophysical studies. |
− | ===Number of | + | ===Number of borings=== |
− | The number of recommended borings are | + | The number of recommended borings are described below. |
− | *Infiltration trenches, bioretention, and filters - a minimum of | + | *Infiltration trenches, bioretention, and filters - a minimum of 2 per practice. |
− | *Ponds/wetlands - a minimum of | + | *Ponds/wetlands - a minimum of 3 per practice, or 3 per acre, whichever is greater. |
*Additional borings - to define lateral extent of limiting horizons, or site specific conditions, where applicable. | *Additional borings - to define lateral extent of limiting horizons, or site specific conditions, where applicable. | ||
− | ===Depth of | + | ===Depth of borings=== |
− | Borings should be extended to a minimum depth of | + | Borings should be extended to a minimum depth of 5 feet below the lowest proposed grade within the practice unless auger/backhoe refusal is encountered. |
− | ===Identification of | + | ===Identification of material=== |
All material penetrated by the boring should be identified, as follows: | All material penetrated by the boring should be identified, as follows: | ||
− | * | + | *description, logging, and sampling for the entire depth of the boring; |
− | * | + | *any stains, odors, or other indications of environmental degradation; |
− | * | + | *a minimum laboratory analysis of 2 soil samples, representative of the material penetrated including potential limiting horizons, with the results compared to the field descriptions; |
− | * | + | *identified characteristics should include, as a minimum: color; mineral composition; grain size, shape, and sorting; and saturation; |
− | * | + | *any indications of water saturation should be carefully logged, to include both perched and groundwater table levels, and descriptions of soils that are mottled or gleyed should be provided; and |
− | * | + | *water levels in all borings should be taken at the time of completion and again 24 hours after completion. The boring should remain fully open to total depth of these measurements. |
− | ===Infiltration | + | ===Infiltration rate testing=== |
Soil permeabilities should be determined in the field using the following procedure (MDE, 2000), or an accepted alternative method. | Soil permeabilities should be determined in the field using the following procedure (MDE, 2000), or an accepted alternative method. | ||
− | *Install casing (solid 6-inch diameter) to | + | *Install casing (solid 6-inch diameter) to 36 inches below proposed practice bottom. |
− | *Remove any smeared soiled surfaces and provide a natural soil interface into which water may percolate. Remove all loose material from the casing. Upon the tester’s discretion, a | + | *Remove any smeared soiled surfaces and provide a natural soil interface into which water may percolate. Remove all loose material from the casing. Upon the tester’s discretion, a 2-inch layer of coarse sand or fine gravel may be placed to protect the bottom from scouring. Fill casing with clean water to a depth of 36 inches and allow to pre-soak for up to 24 hours. |
− | *Refill casing with another | + | *Refill casing with another 36 inches of clean water and monitor water level (measured drop from the top of the casing) for 1 hour. Repeat this procedure (filling the casing each time) three additional times, for a total of 4 observations. Upon the tester’s discretion, the final field rate may either be the average of the 4 observations, or the value of the last observation. The final rate should be reported in inches per hour. |
*May be done through a boring or open excavation. | *May be done through a boring or open excavation. | ||
*The location of the test should correspond to the practice location. | *The location of the test should correspond to the practice location. | ||
*Upon completion of the testing, the casings should be immediately pulled, and the test pit should be back-filled. | *Upon completion of the testing, the casings should be immediately pulled, and the test pit should be back-filled. | ||
− | |||
− |
Soils with low infiltration capacity (defined as soils with infiltration rates less than 0.2 inches per hour) are found throughout the state. Details of where to find soils that can and cannot be used for infiltration systems should begin with available county soil surveys, most of which are available digitally. However, these surveys are not accurate enough to determine site specific characteristics suitable for infiltration systems, so a detailed site analysis is recommended. Stormwater management limitations in areas with tight soils generally preclude large-scale infiltration and ground water recharge (infiltration that passes into the ground water system). These soils will typically be categorized under Hydrologic Soil Group (HSG) D. Tabled values of infiltration rates for these soils are conservative estimates of long-term, sustainable infiltration rates that have been documented in Minnesota. They are based on in-situ measurement within existing infiltration practices in Minnesota, rather than national numbers or rates based on laboratory columns.
Sites with poorly infiltrating soils (defined as soils with infiltration rates less than 0.2 inches per hour) limit the number of practices that can used for stormwater management on a site or specific area of a site. Certain watershed organizations in Minnesota do not allow the use (or strongly discourage the use) of infiltration practices where soil infiltration capacity is low. This does not mean, however, that these tight soils don’t have any infiltration and recharge capabilities. So it may be possible for sites to meet recharge objectives as long as appropriate design modifications have been incorporated.
Table 1 provides an overview of low infiltration capacity soil related design considerations for several structural practice groups.
This table shows structural BMP use in soil with low infiltration capacity
Link to this table
BMP | Low infiltration capacity soil considerations |
---|---|
Bioretention, dry swale, permeable pavement, tree trench/box | Should be constructed with an underdrain. Recharge criteria, if applicable, can be met by modifying the design to include an infiltration gallery below the underdrain, so long as it is appropriately sized. |
Media filter | Recommended practice in tight soils. Some design variants can be modified to incorporate an infiltration gallery that can help meet recharge criteria, if properly sized. |
Infiltration trench or basin |
|
Stormwater ponds | Acceptable practice with tight soils. Soils should help maintain permanent pool. |
Constructed wetlands |
|
Soil testing is recommended for all proposed stormwater facilities that plan to have a recharge or infiltration component to their design. Testing can be less rigorous than that for karst areas or sites with shallow bedrock and soils. The purpose of the testing is to identify and confirm the soil characteristics and determine their suitability, if any, for infiltration practices. The guidelines outlined below should not be interpreted as all-inclusive. The design of any subsurface investigation should reflect the size and complexity of the proposed project.
Borings should be located in order to provide representative area coverage of the of the proposed BMP facilities. The location of borings should be
The number of recommended borings are described below.
Borings should be extended to a minimum depth of 5 feet below the lowest proposed grade within the practice unless auger/backhoe refusal is encountered.
All material penetrated by the boring should be identified, as follows:
Soil permeabilities should be determined in the field using the following procedure (MDE, 2000), or an accepted alternative method.