m
m
 
Line 58: Line 58:
  
 
<noinclude>
 
<noinclude>
[[Category:Level 3 - Category:Level 3 - General information, reference, tables, images, and archives/Tables/Sediment control]]
+
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Sediment control]]
 
</noinclude>
 
</noinclude>

Latest revision as of 13:20, 26 July 2022

Expected performance for check dams
Link to this table

Water Quantity
Flow attenuation Secondary design benefit
Runoff volume reduction Secondary design benefit
Water Quantity
Pollution prevention
Erosion prevention (i.e., for channel banks) Primary design benefit
Sediment control Secondary design benefit
Nutrient loading Secondary design benefit
Pollutant removal
Total suspended solids Secondary design benefit
Total phosphorus Secondary design benefit
Heavy metals Secondary design benefit
Floatables Secondary design benefit
Oil and grease Secondary design benefit

This page was last edited on 26 July 2022, at 13:20.