m |
m |
||
Line 55: | Line 55: | ||
<noinclude> | <noinclude> | ||
− | [[ | + | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Sediment control]] |
</noinclude> | </noinclude> |
Expected performance for stabilized earth/soil berms.
Link to this table
Water quantity | |
---|---|
Flow attenuation | Secondary design benefit |
Runoff volume reduction | Little or no design benefit |
Water quality | |
Soil erosion | Primary design benefit |
Sediment control | Primary design benefit |
Nutrient loading | Secondary design benefit |
Pollutant removal | |
Total suspended solids | Primary design benefit |
Total phosphorus | Secondary design benefit |
Heavy metals | Secondary design benefit |
Floatables | Little or no design benefit |
Oil and grease | Little or no design benefit |
This page was last edited on 26 July 2022, at 13:20.