m |
m |
||
Line 1: | Line 1: | ||
− | + | <font size=3>'''Summary of BMP Construction Costs from Estimator Models'''</font size><br> | |
− | + | Link to this [[Summary of BMP Construction Costs from Estimator Models|table]] | |
− | Link to this [[Summary of BMP Construction Costs from Estimator Models|table]] | ||
<table class="sortable"> | <table class="sortable"> | ||
Line 12: | Line 11: | ||
watershed(acre)</th> | watershed(acre)</th> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>Constructed Wetlands</td> | <td>Constructed Wetlands</td> | ||
Line 19: | Line 17: | ||
<td>C = 3,852X<sup>0.484</sup></td> | <td>C = 3,852X<sup>0.484</sup></td> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<td>Wet Detention Basins</td> | <td>Wet Detention Basins</td> | ||
Line 27: | Line 23: | ||
<td>C = 13,909X<sup>0.672</sup></td> | <td>C = 13,909X<sup>0.672</sup></td> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<td>Infiltration Trenches</td> | <td>Infiltration Trenches</td> | ||
Line 35: | Line 29: | ||
<td>Not reported</td> | <td>Not reported</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<td>Bioretention Basins</td> | <td>Bioretention Basins</td> | ||
Line 43: | Line 35: | ||
<td>C = 10,162X<sup>1.088</sup></td> | <td>C = 10,162X<sup>1.088</sup></td> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<td>Infiltration Basins</td> | <td>Infiltration Basins</td> | ||
Line 51: | Line 41: | ||
<td>Not reported</td> | <td>Not reported</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<td>Dry Ponds</td> | <td>Dry Ponds</td> | ||
Line 59: | Line 47: | ||
<td>Not reported</td> | <td>Not reported</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<td>Sand Filters</td> | <td>Sand Filters</td> | ||
Line 69: | Line 55: | ||
</table> | </table> | ||
− | <noinclude>[[ | + | <noinclude>[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Costs, benefits]]</noinclude> |
Summary of BMP Construction Costs from Estimator Models
Link to this table
BMP | Construction cost converted to 2010 💲 USEPA (1999) per ft3 of treated water volume | Construction cost converted to 2010 💲 per ft3 of treated water volume | C = Cost(💲) (2003)
X = size of watershed(acre) |
---|---|---|---|
Constructed Wetlands | 0.80-1.70 | 0.20-2.40 | C = 3,852X0.484 |
Wet Detention Basins | 0.70-1.40 | 0.30-3.70 | C = 13,909X0.672 |
Infiltration Trenches | 5.40 | 6.50-11.50 | Not reported |
Bioretention Basins | 7.20 | 10.10-11.30 | C = 10,162X1.088 |
Infiltration Basins | 1.80 | Not reported | Not reported |
Dry Ponds | 0.70-1.40 | 0.30-5.00 | Not reported |
Sand Filters | 4.10-8.20 | 3.40-16.80 | C = 47,888X0.882 |
This page was last edited on 3 August 2022, at 20:46.