m
m
 
Line 80: Line 80:
 
</tr>
 
</tr>
 
</table>
 
</table>
 +
 +
<noinclude>
 +
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Models, modeling, model applications and examples]]
 +
</noinclude>

Latest revision as of 14:46, 4 August 2022

P8 mass balance terms
Link to this table

Mass balance term Description
Terms related to inflow
(01) Watershed Inflow Inflow from watershed(s) assigned to the device
(02) Device Inflow Inflow from upstream devices
(09) Total Inflow Total Inflow = (01) + (02)
Terms related to sedimentation, infiltration, and filtration
(03) Infiltration Outflow passing through bottom/sides of device
(05) Filtration Removal Pollutant removed through filtration through media
(04) Exfiltration Exfiltration = (03) - (05)
(08) Sedimentation + Decay Pollutant removed via sedimentation and/or decay
(13) Total Trapped Total Trapped = (05) + (08)
Terms related to outflow
(06) Normal Outflow Outflow passing thru the primary outlet
(07) Spillway Outflow Outflow passing thru the secondary outlet
(10) Surface Outflow Surface Outflow = (06) + (07)
(11) Groundwater Outflow Groundwater Outflow = (03) - (05) = (04)
(12) Total Outflow Total Outflow = (10) + (11)
Terms related to mass balance and error
(14) Storage Increase Increase in storage volume (or mass) from one time step (or event) to the next
(15) Mass Balance Check Error term in mass-balance equations. Error = (12) - (09)

This page was last edited on 4 August 2022, at 14:46.