m |
m (→Related pages) |
||
Line 19: | Line 19: | ||
*[[Requirements, recommendations and information for using stormwater wetland as a BMP in the MIDS calculator.]] | *[[Requirements, recommendations and information for using stormwater wetland as a BMP in the MIDS calculator.]] | ||
− | |||
[[Category:Level 3 - Best management practices/Specifications and details/Construction specifications]] | [[Category:Level 3 - Best management practices/Specifications and details/Construction specifications]] | ||
</noinclude> | </noinclude> |
CADD-based details for pond and wetland systems are contained in the Computer-aided design and drafting (CAD/CADD) drawings section. The following details, with specifications, have been created for stormwater ponds/wetlands:
This page was last edited on 11 December 2022, at 14:42.