m
m
 
Line 1: Line 1:
 
Vehicle tracking pad does not contain enough rock nor is long enough to be effective. Sediment is leaving the site and is tracked onto the pavement. Street should be swept and rock entrance/exit should have rock added, compacted, and designed to an adequate length and width.
 
Vehicle tracking pad does not contain enough rock nor is long enough to be effective. Sediment is leaving the site and is tracked onto the pavement. Street should be swept and rock entrance/exit should have rock added, compacted, and designed to an adequate length and width.
 +
 +
[[Category:Level 3 - General information, reference, tables, images, and archives/Images/Sediment control photos]]

Latest revision as of 16:40, 19 December 2022

Vehicle tracking pad does not contain enough rock nor is long enough to be effective. Sediment is leaving the site and is tracked onto the pavement. Street should be swept and rock entrance/exit should have rock added, compacted, and designed to an adequate length and width.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current15:34, 3 November 2016Thumbnail for version as of 15:34, 3 November 20161,600 × 1,200 (1.72 MB)Mtrojan (talk | contribs)

Metadata

This page was last edited on 19 December 2022, at 16:40.