m
m
 
Line 1: Line 1:
 
There appears to be no vehicle tracking pad installed at the entrance/exit. Sediment is leaving the site. A properly designed entrance pad should be installed appropriate for the vehicles on site and street should be swept of sediment such that the pavement is clean.
 
There appears to be no vehicle tracking pad installed at the entrance/exit. Sediment is leaving the site. A properly designed entrance pad should be installed appropriate for the vehicles on site and street should be swept of sediment such that the pavement is clean.
 +
 +
[[Category:Level 3 - General information, reference, tables, images, and archives/Images/Sediment control photos]]

Latest revision as of 16:41, 19 December 2022

There appears to be no vehicle tracking pad installed at the entrance/exit. Sediment is leaving the site. A properly designed entrance pad should be installed appropriate for the vehicles on site and street should be swept of sediment such that the pavement is clean.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current15:37, 3 November 2016Thumbnail for version as of 15:37, 3 November 20162,304 × 1,728 (1.22 MB)Mtrojan (talk | contribs)

Metadata

This page was last edited on 19 December 2022, at 16:41.