m
m
 
Line 1: Line 1:
 
Energy dissipation is not properly designed or installed for size of pipe outlet. Bare grass and sediment should not be present at pipe outlet.  Sediment should be cleaned out of pipe and more rock should be placed evenly at pipe outlet.
 
Energy dissipation is not properly designed or installed for size of pipe outlet. Bare grass and sediment should not be present at pipe outlet.  Sediment should be cleaned out of pipe and more rock should be placed evenly at pipe outlet.
 +
 +
[[Category:Level 3 - General information, reference, tables, images, and archives/Images/Sediment control photos]]

Latest revision as of 16:43, 19 December 2022

Energy dissipation is not properly designed or installed for size of pipe outlet. Bare grass and sediment should not be present at pipe outlet. Sediment should be cleaned out of pipe and more rock should be placed evenly at pipe outlet.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current16:12, 3 November 2016Thumbnail for version as of 16:12, 3 November 20161,600 × 1,200 (1.97 MB)Mtrojan (talk | contribs)

Metadata

This page was last edited on 19 December 2022, at 16:43.