m
m
 
Line 1: Line 1:
 
Energy dissipation is not properly designed or installed for size of pipe outlet. Rock should be placed on the sides and top of outlet pipe.
 
Energy dissipation is not properly designed or installed for size of pipe outlet. Rock should be placed on the sides and top of outlet pipe.
 +
 +
[[Category:Level 3 - General information, reference, tables, images, and archives/Images/Sediment control photos]]

Latest revision as of 16:43, 19 December 2022

Energy dissipation is not properly designed or installed for size of pipe outlet. Rock should be placed on the sides and top of outlet pipe.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current16:11, 3 November 2016Thumbnail for version as of 16:11, 3 November 2016640 × 480 (164 KB)Mtrojan (talk | contribs)

This page was last edited on 19 December 2022, at 16:43.