(copied text from 2018 page instead of using a transclusion)
m (replaced section 7 with updated title)
 
Line 13: Line 13:
 
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_5_Stormwater_Pollution_Prevention_Plan_(SWPPP)_Content Section 5 Stormwater Pollution Prevention Plan (SWPPP) Content]
 
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_5_Stormwater_Pollution_Prevention_Plan_(SWPPP)_Content Section 5 Stormwater Pollution Prevention Plan (SWPPP) Content]
 
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_6_SWPPP_Amendments Section 6 SWPPP Amendments]
 
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_6_SWPPP_Amendments Section 6 SWPPP Amendments]
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_7_BMP_Selection_and_Installation Section 7 BMP Selection and Installation]
+
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_7_BMP_Selection_and_Stormwater_Management Section 7 BMP Selection and Stormwater Management]
 
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_8_Erosion_Prevention_Practices Section 8 Erosion Prevention Practices]
 
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_8_Erosion_Prevention_Practices Section 8 Erosion Prevention Practices]
 
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_9_Sediment_Control_Practices Section 9 Sediment Control Practices]
 
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_9_Sediment_Control_Practices Section 9 Sediment Control Practices]

Latest revision as of 14:44, 4 August 2023

Warning: This page and the Sections below are considered a guidance document to the 2023 MINNESOTA GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM PROGRAM and is not considered the official permit. A copy of the official permit and coverage letter will be emailed once the permit application has been completed and submitted to the MPCA.
This site is currently undergoing revision. For more information, open this link.
This page will be updated to show the Construction Stormwater Permit that was reissued August 1st, 2023. Some information may no longer be accurate. Consult the construction stormwater website for the most up-to-date information.

This page displays guidance on the table of contents and Sections of the 2023 MINNESOTA GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM PROGRAM.

Table of Contents