m
m (2023)
 
Line 5: Line 5:
  
 
===20.2===
 
===20.2===
<big>[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.23 Permittees] must keep the SWPPP, including all changes to it, and inspections and maintenance records at the site during normal working hours by permittees who have operational control of that portion of the site.</big>
+
<big>[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.23 Permittees] must keep the SWPPP, on- site, or electronically available on-site, during normal working hours with personnel who have operational control over the applicable portion of the site, including all changes to the SWPPP, inspections, and maintenance records.</big>
  
 
<noinclude>
 
<noinclude>
 
[[Category:Level 2 - Regulatory/Construction (CSW)]]
 
[[Category:Level 2 - Regulatory/Construction (CSW)]]
 
</noinclude>
 
</noinclude>

Latest revision as of 15:01, 8 August 2023

SECTION 20 SWPPP AVAILABILITY

20.1

SWPPP Availability.

20.2

Permittees must keep the SWPPP, on- site, or electronically available on-site, during normal working hours with personnel who have operational control over the applicable portion of the site, including all changes to the SWPPP, inspections, and maintenance records.