Temporary construction erosion and sediment control is the practice of preventing or reducing the movement of sediment from a site during construction through the implementation of man-made structures, land management techniques, or natural processes. This page does not contain detail on the use of specific BMPs but instead merely discusses their use and refers the reader to other useful resources for detail.

Information: You may link to the fact sheet from the original Minnesota Stormwater Manual at the following link: File:Temporary Construction Sediment and Erosion Control.docx
photo showing an example of a vegetated buffer
An example of a vegetated buffer adjacent to a construction site.

Introduction

Temporary construction erosion and sediment control limits the amount of sediment that is carried into lakes, streams and rivers by storm water runoff. Sediment carries nutrients and pollutants that degrade water resources and harm aquatic wildlife. Proper planning of construction site activities greatly reduces the impact of soil disturbance activities on nearby resources and diminishes the need for costly restorations. A construction plan that limits sediment disturbance in potential problem areas and uses effective temporary sediment control practices will lessen negative impacts to local water resources and natural areas.

Planning

To establish a construction plan that will minimize sediment movement, designers will need information on existing site conditions and neighboring resources that require special consideration including water bodies, natural areas, bluffs and other highly erodible or sensitive areas. Construction activities should be designed in a manner that minimizes overall soil disturbance and phases areas of disturbance such that the amount of land disturbed at any one time is reduced. This type of planning will limit the need for larger structural sediment control solutions. Additionally, the designer should determine which local, state, and federal agencies require permits for the type of work planned. The site plan will need to account for the requirements of all agencies issuing permits.

Permits

Projects disturbing 1 acre or more of land or part of a common area that is disturbed will require a National Pollutant Discharge Elimination System (NPDES) Construction Stormwater Permit from the Minnesota Pollution Control Agency. The size threshold can be smaller if the site is a part of a “common plan of development or sale” and if the larger common plan will ultimately disturb more than 1 acre (see NPDES Construction General Permit). The permit requires the establishment of a Stormwater Pollution Prevention Plan (SWPPP) for the construction site.

Other Minnesota agencies requiring permits typically might include watersheds, municipalities, and soil and water conservation districts.

photo showing a construction site with no sediment control practices
Example of a construction site with no sediment control practicesr
photo showing a construction site with sediment control practices
Example of a construction site with sediment control practices

Sequencing activities

The practices included in the site plan and SWPPP will need to control runoff, stabilize slopes and exposed soils, and limit the movement of soils into drainage systems and natural areas. A key factor in accomplishing these goals is the sequencing of construction activities such that the minimum possible area is disturbed at any one time. Initial site work should include establishing protective buffer zones adjacent to onsite resources that require protection and setting up perimeter sediment controls.

During the course of construction, a variety of erosion prevention and sediment control practices may be necessary in order to stabilize slopes and drainageways, protect inlets to the storm water conveyance system, limit gully formation, and capture sediment. Several practices can be used as temporary erosion and sediment control practices and these can be used to meet NPDES requirements (see temporary construction erosion and sediment control). Temporary seeding is not erosion protection or sediment control until vegetation is established or until the area is protected with an erosion control blanket. Projects that are actively under construction in winter/frozen months should include additional inspection and clean-up activities. Temporary sediment basins should be sized to include extra storage for snowmelt.

Inspection and maintenance

A final key element to ensure effectiveness of the erosion and sediment control plan is the implementation of an inspection and maintenance program. Frequent inspection and maintenance activities ensure that the installed temporary sediment control practices are operating effectively throughout the course of the project.

Overview of temporary sediment control practices

photo illustrating a vegetated buffer
Photo illustrating a vegetated buffer
  • Vegetated Buffers
    • Uses: erosion control
    • Areas to Use
      • Perimeter
      • Slopes
      • Drainageways
      • Around Trees, Water Bodies, Natural Areas
    • Method: Vegetated buffers are areas designated to remain undisturbed in order to protect trees, lakes, bluffs, or natural areas. Buffers should be marked and maintained around all resources requiring protection.
    • NPDES General Construction Storm water Permit Requirement
      • Delineate areas of no disturbance before beginning site work.


photo illustrating a silt fence
Photo illustrating a Silt Fence
  • Silt Fence
    • Uses: sediment control
    • Areas to Use
      • Perimeter
      • Slopes
      • Drainageways
      • Other: Drainage System Inlets
    • Method: Silt fence filters sediment from runoff by allowing water to pass through a geotextile fabric or by creating a pool to allow sediment to drop out of the water column. Silt fence is installed primarily at downslope boundaries of the work area but can also be used for inlet protection, and around the perimeter of stockpiles
    • NPDES General Construction Storm water Permit Requirement
      • Sediment control must be established on all down gradient perimeters prior to commencement of land disturbing activities.
      • All storm drain inlets must be protected.


photo illustrating a silt fence
Photo illustrating a Fiber Log
  • Fiber Log
    • Areas to Use
      • Sediment Control
      • Perimeter
      • Slopes
      • Drainageways
      • Other
        • Drainage System Inlets
    • Method
      • Fiber logs include straw, wood, or coconut fiber logs, compost logs, and rock logs that slow water and filter sediment. Fiber logs are used for inlet protection, ditch checks, and as perimeter control where silt fence is infeasible.
    • NPDES General Construction Storm water Permit Requirement
      • Sediment control must be established on all down gradient perimeters prior to commencement of land disturbing activities.
      • All storm drain inlets must be protected.
      • Drainage ditches within 200 feet of a surface water or the property edge must be stabilized within 24 hours of connection to a surface water.
      • No unbroken slope of length greater than 75 feet for slopes of 3:1 or steeper.
      • Slopes within 200 feet of a surface water must have temporary protection or permanent cover within the following timeframe based on slope:


photo illustrating a Rock Construction Entrance
Photo illustrating a Rock Construction Entrance
  • Rock Construction Entrance
    • Areas to Use
      • Sediment Control
      • Perimeter
    • Method
      • A rock construction entrance is a bed of rocks that helps to remove sediment from vehicle tires. Rock construction entrances should be placed at all site access points. The use of 1 1/2 inch – 3 inch clear aggregate is recommended. Periodic cleaning or replacement is recommended
    • NPDES General Construction Storm water Permit Requirement
      • Vehicle tracking of sediment must be minimized.
File:Example of grade breaks.jpg
Photo illustrating a Rock Construction Entrance


  • Grade Breaks
    • Areas to Use
      • Sediment Control
      • Slopes
    • Method
      • Grade breaks are changes in slope that break up concentrated flow, preventing the formation of gullies. Grade breaks should be incorporated into long slopes
    • NPDES General Construction Storm water Permit Requirement
      • No unbroken slope of length greater than 75 feet for slopes of 3:1 or steeper.
      • Slopes within 200 feet of a surface water must have temporary protection or permanent cover within the following timeframe based on slope:


photo illustrating Grade Breaks
Photo illustrating Temporary Seeding
  • Temporary Seeding
    • Areas to Use
      • Erosion Protection
      • Sediment Control
      • Perimeter
      • Slopes
      • Drainageways
    • Method
      • Temporary seeding allows plants to stabilize the soil through vegetation and root growth. A large variety of plants are available for temporary seeding of different conditions; the most common are rye grass, winter wheat, and oats.
    • NPDES General Construction Storm water Permit Requirement
      • Drainage ditches within 200 feet of a surface water or the property edge must be stabilized within 24 hours of connection to a surface water.
      • No unbroken slope of length greater than 75 feet for slopes of 3:1 or steeper.
      • Slopes within 200 feet of a surface water must have temporary protection or permanent cover within the following timeframe based on slope:


photo illustrating Grade Breaks
Photo illustrating an Erosion Control Blanket
  • Erosion Control Blanket
    • Areas to Use
      • Erosion Protection
      • Sediment Control
      • Perimeter
      • Slopes
      • Drainageways
    • Method
      • Erosion control blanket is a mat made of netting layered with straw, wood, coconut or man-made fibers that prevents erosion by sheltering the soil from rainfall and runoff while holding moisture for establishing plants. Blankets are installed in channels
    • NPDES General Construction Storm water Permit Requirement
      • No unbroken slope of length greater than 75 feet for slopes of 3:1 or steeper.
      • Slopes within 200 feet of a surface water must have temporary protection or permanent cover within the following timeframe based on slope:
photo illustrating Grade Breaks
Photo illustrating Mulch


  • Mulch
    • Areas to Use
      • Erosion Protection
      • Slopes
    • Method
      • Mulch is wood fibers, compost, wood chips, straw, or hay that is applied as a cover to disturbed soil. Mulch reduces erosion by absorbing energy from rainfall and runoff and provides protection and moisture for the establishment of vegetation, when properly disc anchored or spread.
    • NPDES General Construction Storm water Permit Requirement
      • Drainage ditches within 200 feet of a surface water or the property edge must be stabilized within 24 hours of connection to a surface water.
      • No unbroken slope of length greater than 75 feet for slopes of 3:1 or steeper.
      • Slopes within 200 feet of a surface water must have temporary protection or permanent cover within the following timeframe based on slope:
photo illustrating Hydraulic Mulch
Photo illustrating Mulch


  • Hydraulic Mulch
    • Areas to Use
      • Erosion Protection
      • Slopes
    • Method
      • Hydraulic mulches for erosion control are typically comprised of wood fibers and are applied by hydroseeding equipment. Hydraulic mulches are typically used in areas with steeper slopes or where equipment access would be difficult.
    • NPDES General Construction Storm water Permit Requirement
      • Drainage ditches within 200 feet of a surface water or the property edge must be stabilized within 24 hours of connection to a surface water.
      • No unbroken slope of length greater than 75 feet for slopes of 3:1 or steeper.
      • Slopes within 200 feet of a surface water must have temporary protection or permanent cover within the following timeframe based on slope:
photo illustrating Temporary Pipe Downdrains
Photo illustrating Mulch


  • Temporary Pipe Downdrains
    • Areas to Use
      • Erosion Protection
      • Slopes
    • Method
      • A temporary pipe downdrain conveys runoff down slopes in a pipe so that runoff will not cause erosion. Pipe downdrains are installed where concentrated flow would drain onto a disturbed slope


photo illustrating Temporary Pipe Downdrains
Photo illustrating Floatation Silt Curtain
  • Floatation Silt Curtain
    • Areas to Use
      • Sediment Control
      • Other
        • Lakes, Wetlands, Streams
    • Method
      • Floatation silt curtain is fabric fence installed in water bodies to contain sediment near the banks of the work area. Must be used in conjunction with other sediment control techniques
photo illustrating Temporary Pipe Downdrains
Photo illustrating Rock or Compost Bags
  • Rock or Compost Bags
    • Areas to Use
      • Sediment Control
      • Slopes
      • Other
        • Drainage System Inlets
    • Method
      • Rock and compost bags are filled bags that are used to filter water, control ditch grade, or to provide inlet protection
    • NPDES General Construction Storm water Permit Requirement
      • Install energy dissipation measures at pipe outlets within 24 hours of connecting to a surface water.
photo illustrating Temporary Pipe Downdrains
Photo illustrating Rock Check Dam


  • Rock Check Dam
    • Areas to Use
      • Sediment Control
      • Drainageways
    • Method
      • Rock and compost bags are filled bags that are used to filter water, control ditch grade, or to provide inlet protection
    • NPDES General Construction Storm water Permit Requirement
      • Drainage ditches within 200 feet of a surface water or the property edge must be stabilized within 24 hours of connection to a surface water.
photo illustrating Riprap
Photo illustrating Rock Check Dam


  • Riprap
    • Areas to Use
      • Erosion Protection
      • Other
        • Drainage System Inlets
    • Method
      • Riprap is appropriately sized rocks that reduce the energy of fast moving flows. Riprap is used along channels and at outfalls
    • NPDES General Construction Storm water Permit Requirement
      • Drainage ditches within 200 feet of a surface water or the property edge must be stabilized within 24 hours of connection to a surface water.


photo illustrating a Temporary Sedimentation Basin
Photo illustrating Rock Check Dam


  • Temporary Sedimentation Basin
    • Areas to Use
      • Sediment Control
      • Other
        • Throughout Site
    • Method
      • Temporary sedimentation basins are depressions that capture runoff to slow the flow of water and allow sediment to settle out
    • NPDES General Construction Storm water Permit Requirement
      • Install temporary basin where 10 acres or more drains to a common location.
photo illustrating a Temporary Sedimentation Basin
Photo illustrating Filter Bag
  • Filter Bag
    • Areas to Use
      • Sediment Control
      • Other
        • Drainage System Inlets
    • Method
      • Filter bags are mesh bags that capture sediment but allow water to pass through. Filter bags are installed in storm drain inlets.