m |
m |
||
Line 1,632: | Line 1,632: | ||
<tr> | <tr> | ||
− | <td>Community and environment</td> | + | <td rowspan=18>Community and environment</td> |
<td>Construction cost</td> | <td>Construction cost</td> | ||
<td>Temporary construction sediment control</td> | <td>Temporary construction sediment control</td> | ||
Line 1,639: | Line 1,639: | ||
<tr> | <tr> | ||
− | |||
<td>Construction cost</td> | <td>Construction cost</td> | ||
<td>Temporary construction sediment control</td> | <td>Temporary construction sediment control</td> | ||
Line 1,647: | Line 1,646: | ||
<tr> | <tr> | ||
− | |||
<td>Construction cost</td> | <td>Construction cost</td> | ||
<td>Filtration</td> | <td>Filtration</td> | ||
Line 1,654: | Line 1,652: | ||
<tr> | <tr> | ||
− | |||
<td>Habitat quality</td> | <td>Habitat quality</td> | ||
<td>Better Site Design</td> | <td>Better Site Design</td> | ||
Line 1,661: | Line 1,658: | ||
<tr> | <tr> | ||
− | |||
<td>Habitat quality</td> | <td>Habitat quality</td> | ||
<td>Bioretention</td> | <td>Bioretention</td> | ||
<td>Infiltration recharge</td> | <td>Infiltration recharge</td> | ||
</tr> | </tr> | ||
+ | |||
<tr> | <tr> | ||
− | |||
<td>Habitat quality</td> | <td>Habitat quality</td> | ||
<td>Bioretention</td> | <td>Bioretention</td> | ||
Line 1,674: | Line 1,670: | ||
<tr> | <tr> | ||
− | |||
<td>Habitat quality</td> | <td>Habitat quality</td> | ||
<td>Bioretention</td> | <td>Bioretention</td> | ||
Line 1,681: | Line 1,676: | ||
<tr> | <tr> | ||
− | |||
<td>Habitat quality</td> | <td>Habitat quality</td> | ||
<td>Bioretention</td> | <td>Bioretention</td> | ||
Line 1,689: | Line 1,683: | ||
<tr> | <tr> | ||
− | |||
<td>Habitat quality</td> | <td>Habitat quality</td> | ||
<td>Filtration</td> | <td>Filtration</td> | ||
Line 1,696: | Line 1,689: | ||
<tr> | <tr> | ||
− | |||
<td>Habitat quality</td> | <td>Habitat quality</td> | ||
<td>Filtration</td> | <td>Filtration</td> | ||
Line 1,703: | Line 1,695: | ||
<tr> | <tr> | ||
− | |||
<td>Habitat quality</td> | <td>Habitat quality</td> | ||
<td>Constructed wetlands</td> | <td>Constructed wetlands</td> | ||
Line 1,710: | Line 1,701: | ||
<tr> | <tr> | ||
− | |||
<td>Habitat quality</td> | <td>Habitat quality</td> | ||
<td>Constructed wetlands</td> | <td>Constructed wetlands</td> | ||
Line 1,717: | Line 1,707: | ||
<tr> | <tr> | ||
− | |||
<td>Habitat quality</td> | <td>Habitat quality</td> | ||
<td>Constructed wetlands</td> | <td>Constructed wetlands</td> | ||
Line 1,724: | Line 1,713: | ||
<tr> | <tr> | ||
− | |||
<td>Nuisance</td> | <td>Nuisance</td> | ||
<td>Infiltration</td> | <td>Infiltration</td> | ||
Line 1,731: | Line 1,719: | ||
<tr> | <tr> | ||
− | |||
<td>Nuisance</td> | <td>Nuisance</td> | ||
<td>Infiltration</td> | <td>Infiltration</td> | ||
Line 1,738: | Line 1,725: | ||
<tr> | <tr> | ||
− | |||
<td>Nuisance</td> | <td>Nuisance</td> | ||
<td>Infiltration</td> | <td>Infiltration</td> | ||
Line 1,745: | Line 1,731: | ||
<tr> | <tr> | ||
− | |||
<td>Nuisance</td> | <td>Nuisance</td> | ||
<td>Infiltration</td> | <td>Infiltration</td> |
Recommended best management practices | ||||
---|---|---|---|---|
Pollution prevention | Pollution prevention | Municipal | ||
I/Ca | ||||
Runoff minimization | Volume reduction | |||
Capture and re-use | ||||
Temporary construction sediment control | Perimeter | |||
Slope | ||||
Drainageway | ||||
Otherb | ||||
Inspect & maintain | ||||
Minimize runoff | Reduce volume | Better Site Design | ||
Runoff minimization | Volume reduction | |||
Capture and re-use | ||||
Bioretention | Infiltration recharge | |||
Filtration partial recharge | ||||
Infiltration filtration recharge | ||||
Infiltration | Infiltration basin | |||
Infiltration trench | ||||
Dry well | ||||
Underground system | ||||
Minimize runoff | Increase recharge | Better Site Design | ||
Runoff minimization | Volume reduction | |||
Capture and re-use | ||||
Bioretention | Infiltration recharge | |||
Filtration partial recharge | ||||
Infiltration filtration recharge | ||||
Filtration | Media (sand) | |||
Vegetative | ||||
Infiltration | Infiltration basin | |||
Infiltration trench | ||||
Dry well | ||||
Underground system | ||||
Minimize runoff | Improve water quality | Better Site Design | ||
Pollution prevention | Residential | |||
Municipall | ||||
I/Ca | ||||
Temporary construction sediment control | Perimeter | |||
Slope | ||||
Drainageway | ||||
Otherb | ||||
Inspect & maintain | ||||
Filtration | Vegetative | |||
Stormwater ponds | With extended detention | |||
Without extended detention | ||||
Constructed wetlands | Shallow wetland | |||
ED shallow wetland | ||||
Pond wetland system | ||||
Minimize runoff | Reduce costs | Better Site Design | ||
Temporary construction sediment control | Pre-construction | |||
Local feasibility | Pollution prevention | Residential | ||
Municipal | ||||
Temporary construction sediment control | Perimeter | |||
Slope | ||||
Drainageway | ||||
Otherb | ||||
Cold climate | Better Site Design | |||
Pollution prevention | Municipal | |||
I/Ca | ||||
Filtration | Media (sand) | |||
Vegetative | ||||
Stormwater ponds | With extended detention | |||
Without extended detention | ||||
Constructed wetlands | Shallow wetland | |||
ED shallow wetlandd | ||||
Pond wetland system | ||||
Supplemental treatment | Filtration devices | |||
Hydrodynamic devices | ||||
Temporary construction sediment control | Better Site Design | |||
Pollution prevention | Municipal | |||
I/Ca | ||||
Temporary construction sediment control | Pre-construction | |||
Perimeter | ||||
Slope | ||||
Drainageway | ||||
Otherb | ||||
Inspect & maintain | ||||
Bioretention | Filtration | |||
Filtration | Media (sand) | |||
Vegetative | ||||
Stormwater ponds | With extended detention | |||
Without extended detention | ||||
Constructed wetlands | Pond wetland system | |||
Supplemental treatments | Filtration devices | |||
Hydrodynamic devices | ||||
Watershed factors | Lakes | Better Site Design | ||
Pollution preventionn | Residential | |||
Municipal | ||||
I/Ca | ||||
Runoff minimization | Volume reduction | |||
Temporary construction sediment control | Perimeter | |||
Slope | ||||
Drainageway | ||||
Otherb | ||||
Bioretention | Infiltration recharge | |||
Filtration partial recharge | ||||
Infiltration filtration recharge | ||||
Filtration | ||||
Filtration | ||||
Media (sand) | ||||
Vegetative | ||||
Infiltration | Infiltration basin | |||
Infiltration trench | ||||
Dry well | ||||
Underground system | ||||
Stormwater ponds | With extended detention | |||
Without extended detention | ||||
Constructed wetlands | Pond wetland system | |||
Supplemental treatment | Chemical biological treatment | |||
Watershed factors | Trout resources | Better Site Design | ||
Runoff minimization | Volume reduction | |||
Temporary construction sediment control | Drainageway | |||
Bioretention | Infiltration recharge | |||
Filtration partial rechargee | ||||
Infiltration filtration recharge | ||||
Filtration | ||||
Filtration | Media (sand) | |||
Vegetative | ||||
Infiltration | Infiltration basin | |||
Infiltration trench | ||||
Dry well | ||||
Underground system | ||||
Constructed wetlands | Pond wetland system | |||
Watershed factors | Drinking water | Better Site Design | ||
Pollution prevention | Residential | |||
Municipal | ||||
Runoff minimization | Volume reduction | |||
Temporary construction sediment control | Perimeter | |||
Slope | ||||
Drainageway | ||||
Otherb | ||||
Bioretention | Infiltration recharge | |||
Filtration partial recharge | ||||
Infiltration filtration recharge | ||||
Infiltration | Infiltration basin | |||
Infiltration trench | ||||
Dry well | ||||
Underground system | ||||
Stormwater ponds | With extended detention | |||
Without extended detention | ||||
Constructed wetlands | Pond wetland system | |||
Watershed factors | Wetlands (calcareous fens) | Better Site Design | ||
Bioretention | Filtration partial recharge | |||
Infiltration filtration recharge | ||||
Filtration | ||||
Media (sand) | ||||
Vegetative | ||||
Infiltration | Infiltration basin | |||
Infiltration trench | ||||
Dry well | ||||
Underground system | ||||
Stormwater ponds | Stormwater ponds | |||
Without extended detention | ||||
Constructed wetlands | Shallow wetland | |||
ED shallow wetland | ||||
Pond wetland system | ||||
Supplemental treatment | Chemical biological treatment | |||
Watershed factors | Impaired waters | Better Site Design | ||
Pollution prevention | Residential | |||
Municipal | ||||
Runoff minimization | Volume reduction | |||
Temporary construction sediment control | Perimeter | |||
Slope | ||||
Drainageway | ||||
Bioretention | Infiltration filtration recharge | |||
Filtration | ||||
Filtration | Media (sand) | |||
Vegetative | ||||
Stormwater ponds | Stormwater ponds | |||
Without extended detention | ||||
Constructed wetlands | Shallow wetland | |||
ED shallow wetland | ||||
Pond wetland system | ||||
Climate and terrain | Active karst | Runoff minimization | Volume reduction | |
Capture and re-use | ||||
Temporary construction sediment control | Slope | |||
Bioretention | Filtration | |||
Filtration | Media (sand) | |||
Vegetative | ||||
Constructed wetland | Shallow wetland | |||
Low infiltration soil | Runoff minimization | Volume reduction | ||
Runoff minimization | Capture and re-use | |||
Temporary construction sediment control | Perimeter | |||
Slope | ||||
Stormwater ponds | Stormwater ponds | |||
Without extended detention | ||||
Constructed wetlands | Shallow wetland | |||
ED shallow wetland | ||||
Pond wetland system | ||||
Climate and terrain | High snowfall | Pollution prevention | Municipal | |
Runoff minimization | Volume reduction | |||
Capture and re-use | ||||
Temporary construction sediment control | Slope | |||
Drainageway | ||||
Inspect & maintain | ||||
Bioretention | Infiltration filtration recharge | |||
Filtration | ||||
Infiltration | Infiltration trench | |||
Dry well | ||||
Underground system | ||||
Stormwater ponds | Stormwater ponds | |||
Without extended detention | ||||
Constructed wetlands | Shallow wetland | |||
ED shallow wetland | ||||
Pond wetland system | ||||
Supplemental treatment | Filtration devices | |||
Hydrodynamic devices | ||||
Low rainfall | Bioretention | Filtration | ||
Filtration | Media (sand) | |||
Vegetative | ||||
Stormwater ponds | Without extended detention | |||
Constructed wetlands | Shallow wetland | |||
ED shallow wetland | ||||
Stormwater treatment suitability | Recharge | Better Site Design | ||
Runoff minimization | Volume reduction | |||
Capture and re-use | ||||
Bioretention | Infiltration recharge | |||
Filtration partial recharge | ||||
Infiltration filtration recharge | ||||
Infiltration | Infiltration basin | |||
Infiltration trench | ||||
Dry well | ||||
Underground system | ||||
Water quality | Better Site Design | |||
Pollution prevention | Residential | |||
Municipal | ||||
I/Ca | ||||
Temporary construction sediment control | Perimeter | |||
Slope | ||||
Drainageway | ||||
Otherb | ||||
Inspect & maintain | ||||
Filtration | Media (sand) | |||
Vegetative | ||||
Stormwater ponds | Stormwater ponds | |||
Without extended detention | ||||
Constructed wetlands | Shallow wetland | |||
ED shallow wetland | ||||
Pond wetland system | ||||
Stormwater treatment suitability | Channel protection | Better Site Design | ||
Pollution prevention | Municipal | |||
Runoff minimization | Volume reduction | |||
Temporary construction sediment control | Perimeter | |||
Slope | ||||
Drainageway | ||||
Stormwater ponds | Stormwater ponds | |||
Without extended detention | ||||
Constructed wetlands | Shallow wetland | |||
ED shallow wetland | ||||
Pond wetland system | ||||
Stormwater treatment suitability | Peak discharge | Pollution prevention | Municipal | |
Runoff minimization | Volume reduction | |||
Temporary construction sediment control | Slope | |||
Bioretention | Infiltration recharge | |||
Filtration partial recharge | ||||
Filtration | ||||
Filtration | Media (sand) | |||
Vegetative | ||||
Infiltration | Infiltration basin | |||
Infiltration trench | ||||
Dry well | ||||
Underground system | ||||
Stormwater ponds | Stormwater ponds | |||
Without extended detention | ||||
Shallow wetland | ||||
ED shallow wetland | ||||
Pond wetland system | ||||
PSHc | Better Site Design | |||
Pollution prevention | Residential | |||
Municipal | ||||
I/Ca | ||||
Filtration | Media (sand) | |||
Vegetative | ||||
Infiltration | Infiltration basin | |||
Physical feasibility | Soils | Temporary construction sediment control | Perimeter | |
Slope | ||||
Drainageway | ||||
Bioretention | Filtration | |||
Filtration | Media (sand) | |||
Vegetative | ||||
Elevation difference | Bioretention | Filtration | ||
Depth to rock | Better Site Design | |||
Bioretention | Filtration | |||
Filtration | Media (sand) | |||
Vegetative | ||||
Constructed wetlands | Shallow wetland | |||
ED shallow wetland | ||||
Supplemental treatment | Hydrodynamic devices | |||
Physical feasibility | Depth to water table | Better Site Design | ||
Runoff minimization | Capture and re-use | |||
Bioretention | Filtration | |||
Filtration | Media (sand) | |||
Vegetative | ||||
Constructed wetlands | Shallow wetland | |||
ED shallow wetland | ||||
Supplemental treatment | Hydrodynamic devices | |||
Site slope | Better Site Design | |||
Temporary construction sediment control | Perimeter | |||
Slope | ||||
Drainageway | ||||
Physical feasibility | Ultra-urban | Better Site Design | ||
Pollution prevention | Residential | |||
Municipal | ||||
Runoff minimization | Capture and re-use | |||
Temporary construction sediment control | Perimeter | |||
Slope | ||||
Bioretention | Infiltration recharge | |||
Filtration partial recharge | ||||
Infiltration filtration rechargee | ||||
Filtration | ||||
Filtration | Media (sand) | |||
Vegetative | ||||
Infiltration | Underground system | |||
Supplemental treatment | Filtration devices | |||
Hydrodynamic devicess | ||||
Community and environment | Ease of maintenance | Better Site Design | ||
Pollution prevention | Residential | |||
Municipal | ||||
Temporary construction sediment control | Perimeter | |||
Slope | ||||
Filtration | Vegetative | |||
Constructed wetlands | Shallow wetland | |||
ED shallow wetland | ||||
Supplemental treatment | Filtration devices | |||
Community acceptance | Better Site Design | s | ||
Pollution prevention | Residential | |||
Municipal | ||||
Temporary construction sediment control | Perimeter | |||
Perimeter | ||||
Slope | ||||
Bioretention | Filtration | |||
Filtration | Vegetative | |||
Stormwater ponds | Stormwater ponds | |||
Without extended detention | ||||
Constructed wetlands | Shallow wetland | |||
ED shallow wetland | ||||
Pond wetland system | ||||
Supplemental treatment | Filtration devices | |||
Community and environment | Construction cost | Better Site Design | ||
Community and environment | Construction cost | Temporary construction sediment control | Pre-construction | |
Construction cost | Temporary construction sediment control | Perimeter | ||
Construction cost | Filtration | Vegetative | ||
Habitat quality | Better Site Design | |||
Habitat quality | Bioretention | Infiltration recharge | ||
Habitat quality | Bioretention | Filtration partial recharge | ||
Habitat quality | Bioretention | Infiltration filtration recharge | ||
Habitat quality | Bioretention | Filtration | ||
Habitat quality | Filtration | Media (sand) | ||
Habitat quality | Filtration | Vegetative | ||
Habitat quality | Constructed wetlands | Shallow wetland | ||
Habitat quality | Constructed wetlands | ED shallow wetland | ||
Habitat quality | Constructed wetlands | Pond wetland system | ||
Nuisance | Infiltration | Infiltration basin | ||
Nuisance | Infiltration | Infiltration trench | ||
Nuisance | Infiltration | Dry well | ||
Nuisance | Infiltration | Underground system | ||
Location-specific restrictions and setbacks | Pollution prevention | Municipal | ||
Location-specific restrictions and setbacks | Temporary construction sediment control | Drainageway | ||
Knowledge of performance and reliability | Better Site Design | |||
Knowledge of performance and reliability | Pollution prevention | Municipal | ||
Knowledge of performance and reliability | Pollution prevention | I/Ca | ||
Knowledge of performance and reliability | Runoff minimization | Volume reduction | ||
Knowledge of performance and reliability | Temporary construction sediment control | Perimeter | ||
Knowledge of performance and reliability | Temporary construction sediment control | Slope | ||
Knowledge of performance and reliability | Temporary construction sediment control | Drainageway | ||
Knowledge of performance and reliability | Temporary construction sediment control | Inspect & maintain | ||
Knowledge of performance and reliability | Bioretention | Filtration | ||
Knowledge of performance and reliability | Filtration | Media (sand) | ||
Knowledge of performance and reliability | Filtration | Vegetative | ||
Knowledge of performance and reliability | Stormwater ponds | Stormwater ponds | ||
Knowledge of performance and reliability | Stormwater ponds | Without extended detention | ||
Knowledge of performance and reliability | Constructed wetlands | Shallow wetland | ||
Knowledge of performance and reliability | Constructed wetlands | ED shallow wetland | ||
Knowledge of performance and reliability | Constructed wetlands | Pond wetland system |