(Created page with " <font size=3>'''Bioretention device cost estimate worksheet.'''</font size><br> Link to this table <table class="sortable"> ...")
 
m
Line 1: Line 1:
 
 
<font size=3>'''Bioretention device cost estimate worksheet.'''</font size><br>
 
<font size=3>'''Bioretention device cost estimate worksheet.'''</font size><br>
 
Link to this [[Bioretention device cost estimate worksheet|table]]
 
Link to this [[Bioretention device cost estimate worksheet|table]]
 
  
 
<table class="sortable">
 
<table class="sortable">
Line 69: Line 67:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 
 
  
 
<tr>
 
<tr>
Line 123: Line 119:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
Line 167: Line 162:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
Line 185: Line 179:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
Line 191: Line 184:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
 
<th colspan=5>Annual Operation and Maintenance</th>
 
<th colspan=5>Annual Operation and Maintenance</th>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
Line 220: Line 211:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
Line 229: Line 219:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
Line 238: Line 227:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
Line 247: Line 235:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
Line 256: Line 243:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
Line 265: Line 251:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
Line 275: Line 260:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
Line 281: Line 265:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
 
<td colspan=5>'''Minnesota Location Factors'''</td>
 
<td colspan=5>'''Minnesota Location Factors'''</td>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
Line 296: Line 277:
 
<td colspan=3>0.963</td>
 
<td colspan=3>0.963</td>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
Line 302: Line 282:
 
<td colspan=3>1.003</td>
 
<td colspan=3>1.003</td>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
Line 308: Line 287:
 
<td colspan=3>0.962</td>
 
<td colspan=3>0.962</td>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
Line 314: Line 292:
 
<td colspan=3>0.991</td>
 
<td colspan=3>0.991</td>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
Line 320: Line 297:
 
<td colspan=3>0.990</td>
 
<td colspan=3>0.990</td>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
Line 326: Line 302:
 
<td colspan=3>0.963</td>
 
<td colspan=3>0.963</td>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
Line 332: Line 307:
 
<td colspan=3>1.035</td>
 
<td colspan=3>1.035</td>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
Line 338: Line 312:
 
<td colspan=3>0.983</td>
 
<td colspan=3>0.983</td>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
Line 344: Line 317:
 
<td colspan=3>1.000</td>
 
<td colspan=3>1.000</td>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
Line 350: Line 322:
 
<td colspan=3>1.002</td>
 
<td colspan=3>1.002</td>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
Line 356: Line 327:
 
<td colspan=3>1.042</td>
 
<td colspan=3>1.042</td>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
Line 362: Line 332:
 
<td colspan=3>0.961</td>
 
<td colspan=3>0.961</td>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
Line 368: Line 337:
 
<td colspan=3>0.935</td>
 
<td colspan=3>0.935</td>
 
</tr>
 
</tr>
 
  
 
<tr>
 
<tr>
Line 374: Line 342:
 
</table>
 
</table>
  
 +
<font size=1>Note: Suggested unit costs are based on RS Means prices for Spring, 2005, then factored into an area basis based on typical design features for Constructed Wetlands BMPs. To be used for preliminary cost estimation</font size>
  
<p>Note: Suggested unit costs are based on RS Means prices for Spring, 2005, then factored into an area basis based on typical design features for Constructed Wetlands BMPs. To be used for preliminary cost estimation</p>
+
<noinclude>[[category:table]]</noinclude>
 
 
 
 
[[category:table]]
 

Revision as of 14:15, 18 August 2013

Bioretention device cost estimate worksheet.
Link to this table

Project Title
Owner
Location
Project Number
Date
Description Units Quantity Unit Cost Total Estimated Price
Site Preparation
Tree removal - up to 12" diameter each $350.00 $0.00
Clear and grub brush square yard $1.50 $0.00
Tree protection - temp. fence lineal foot $3.00 $0.00
Topsoil - 6" depth, salvage on site square yard $4.50 $0.00
Site Formation
Excavation - 4' average depth square yard $10.00 $0.00
Grading square yard $1.50 $0.00
Hauling off-site square yard $5.50 $0.00
Structural Components
Underdrain - with pea gravel and geotextile lineal foot $30.00 $0.00
Inlet structure each $1,500.00 $0.00
Outlet structure each $2,500.00 $0.00
Site Restoration
Filter strip square yard $0.00 $0.00
Soil preparation square yard $30.00 $0.00
Seeding - above outlet elevation square yard $0.50 $0.00
Planting - below outlet elevation square yard $30.00 $0.00
Mulch square yard $5.00 $0.00
Subtotal $0.00
10% Contingencies $0.00
Subtotal $0.00
Apply MN Location Factor $0.00
TAL CONSTRUCTION COST $0.00
Annual Operation and Maintenance
Debris removal per visit $50.00 $0.00
Weed control per visit $50.00 $0.00
Sediment removal per yeart $500.00 $0.00
Replace planting media square yard $12.00 $0.00
Replace plants per plant $5.00 $0.00
Mow filter strips per visit $50.00 $0.00
Erosion repair square yard $75.00 $0.00
Inspection per visit $125.00 $0.00
Subtotal $0.00
Apply MN Location Factor $0.00
TOTAL ANNUAL O&M COST $0.00
Minnesota Location Factors
Bemidji 0.963
Brainerd 1.003
Detroit Lakes 0.962
Duluth 0.991
Mankato 0.990
Bemidji 0.963
Minneapolis 1.035
Rochester 0.983
St. Paul 1.000
St. Cloud 1.002
Thief River Falls 1.042
Willmar 0.961
Windom 0.935

Note: Suggested unit costs are based on RS Means prices for Spring, 2005, then factored into an area basis based on typical design features for Constructed Wetlands BMPs. To be used for preliminary cost estimation