The six better site design approaches that could be eligible for water quality volume reduction stormwater credits include:
For consistency with other sections of this Manual, the formulas for computing water quality volumes and related credits are based on the requirements contained in the MPCA Construction General Permit (CGP). These formulas provide just one option for local authorities to consider. The approach used in these examples subtracts the credit volume from the water quality volume (Vwq); the volume of a permanent pool (Vpp) in a stormwater pond or wetland is not adjusted. Other options that could be considered include applying credits to Vpp, or proportional application of a credit to both Vpp and Vwq.
It is not the intention of this system of credits to eliminate the need for a water quality volume. It is possible that the area proposed for conservation exceeds the area proposed as impervious surface. In this circumstance, it is recommended that a minimum water quality volume equal to 0.2 watershed inches be maintained (see Unified sizing criteria.
Local authorities should keep in mind that the current MPCA CGP, which expires in 2008, does not incorporate a technique for application of these credits. This CGP does allow up to a maximum of 1% of a site, up to three acres to drain untreated to natural areas, in sites where any BMP is not feasible.
Although stormwater credits are not currently used under the Minnesota Pollution Control Agency Construction General Permit (CGP), they can be applied at the local and watershed levels to supplement the CGP or be used for projects not covered under the CGP. Credits can also be used as part of the financial evaluation under a local stormwater utility program, similar to the Minneapolis approach. Further evaluation of the use of credits in the CGP process will occur as part of the permit update process over the next year.
Although not explicitly allowed under the current MPCA CGP, there are situations where a local authority could create a water quality credit system which does not conflict with the CGP. For example, a local authority that requires a water quality volume that is greater than the CGP water quality volume, could apply credits against the difference between the two volumes. Another situation appropriate for credits could be retrofit projects that do not create new impervious surfaces. These projects are not subject to permanent stormwater management requirements of the CGP. Local authorities interested in establishing a credit system prior to expiration of the CGP in 2008, are encouraged to contact the MPCA to explore if the local proposal is compatible with the CGP.
The Credits for better site Design#Adapting credits for local uselast section presents tips on how to establish and administer a local stormwater credit system, with an emphasis on review and verification during concept design, final design and construction.
Chapter 4 described more than a dozen better site design techniques that can be applied at development sites. When applied early in the design process, these techniques can dramatically reduce stormwater runoff and pollutants generated from development sites (CWP, 1999). In recent years, several states have sought to encourage greater use of better site design techniques by allowing for computation of stormwater credits that reduce the required water quality volume that must be provided at a development site.
Agencies that utilize stormwater credits can sharply reduce water quality and stormwater management BMP size requirements and recommendations. This translates directly into cost savings for developers since the size and cost of stormwater conveyance and treatment systems needed for the site are reduced, and less land area is needed for BMPs. The use of credits by developers is strictly voluntary, although they do offer a meaningful incentive to reduce the cost of stormwater compliance.
Stormwater credits are tied directly to the water quality volume requirements (Vwq and Vpp) outlined in Chapter 10. In addition, credits can be used to reduce the storage volumes needed to manage larger storm events, such as any locally-required channel protection and overbank floods (by increasing times of concentrations and reducing curve numbers in post-development hydrological modeling). Not all credits will be available for each site, and certain site-specific conditions should be met to receive each credit. These minimum conditions include site factors such as maximum flow length or contributing area that avoid situations that could lead to runoff concentration and erosion. Stormwater credits do not relieve designers from the normal standard of engineering practice of safe conveyance and drainage design. Multiple credits can be used at a development site, although two credits cannot be taken for the same physical area of the site. A brief summary of how stormwater credits work is presented in Table 11.1, and further explained with examples in the narrative that follows.
Natural area conservation protects natural resources and environmental features that help maintain the pre-development hydrology of a site by reducing runoff, promoting infiltration and preventing soil erosion. Natural areas should be eligible for stormwater credit if they remain undisturbed during construction and are protected by a permanent conservation easement prescribing allowable uses and activities on the parcel and preventing future development. Examples of conservation areas include any areas of undisturbed vegetation preserved at the development site, such as forests, prairies (native grasslands), floodplains and riparian areas, ridge tops and steep slopes, and stream, wetland and shoreline buffers. Floodplain credits should not be issued to areas that cannot be developed due to existing floodplain ordinance restrictions.
The undisturbed soils and native vegetation of conservation areas promote rainfall interception and storage, infiltration, runoff filtering and direct uptake of pollutants. Portions of the site devoted to natural area conservation are eligible for two credits, such as the addition of a buffer credit.
The total combined area of all conservation areas can be subtracted from total site area when computing the water quality volume (Vwq) portion of the total storage volume. In the context of the four MPCA Vwq sizing rules (see Chapter 10), the credit is numerically expressed as:
Rule 1 (Stormwater Ponds and Constructed Wetlands) and Rule 3 (Non-Ponds):
Rule 2 (Stormwater Ponds and Constructed Wetlands Draining to Special Waters) and Rule 4 (Non-Ponds Draining to Special Waters):
The post-development curve number (CN) used to compute the Vcp, Vp10, and Vp100 for all natural conservation areas can be assumed to be “woods or prairie in good condition” when calculating the total site CN (Chapter 8 and Appendix B).
It is HIGHLY RECOMMENDED that proposed conservation areas meet all of the conditions outlined below to be eligible for credit:
Site reforestation involves planting trees on existing turf or barren ground at a development site with the explicit goal of establishing a mature forest canopy that will intercept rainfall and maximize infiltration. Reforested or restored sites that are protected and maintained under a perpetual conservation easement should be eligible for a stormwater credit.
Reforestation is accomplished through active replanting or natural regeneration of forest cover. Capiella (2005) reviewed a range of research that demonstrated the runoff reduction benefits associated with forest cover compared to turf cover. The runoff benefits include greater infiltration of stormwater, reduced soil erosion, and removal of stormwater pollutants. Forest soils actively promote greater infiltration rates through surface organic matter and macropores created by tree roots. Forests also intercept rainfall in their canopy, reducing the amount of rain that reaches the ground. Evapotranspiration by trees increases potential water storage in the soil.
In some parts of the State, a native grassland (prairie) community is the desired vegetative condition. Since native grasslands have the same hydrological benefits as forest, the same credit is also offered for any prairie restoration conducted at a development site. Two types of credit (water quality and CN adjustment) are available for site reforestation or grassland restoration, which are computed as follows.
BMP guidance for Conserving Wooded Areas in Developing Communities was prepared by DNR in 2000.
The combined total of all reforested or restored areas is divided by two to determine net reforestation area (RA). This is due to the fact that it will take several decades for the replanted area to mature and provide full hydrologic benefits. RA is then subtracted from total site area when computing the water quality volume (Vwq) portion of the total storage volume (Chapter 10). In the context of the four MPCA Vwq sizing rules, the credit is numerically expressed as:
Rule 1 (Stormwater Ponds and Constructed Wetlands) and Rule 3 (Non-Ponds):
Rule 2 (Stormwater Ponds and Constructed Wetlands Draining to Special Waters) and Rule 4 (Non-Ponds Draining to Special Waters):
The post-development curve number (CN) used to compute the Vcp, Vp10, and Vp100 for the reforested area can be assumed to be “woods or prairie in fair condition” when calculating the total site CN, even if it will be decades before the forest reaches maturity.
It is HIGHLY RECOMMENDED that a proposed reforestation or prairie restoration project meet all of the conditions outlined below to qualify for credit:
Buffers may be required at the development site to provide a vegetative setback between development and streams, lakes or wetlands. Portions of the site reserved as buffers and maintained in native vegetation can help filter stormwater runoff. While stream and shoreline buffers are already eligible for the natural area conservation credit, adjacent site area that directly contributes sheet flow to buffers may also be eligible for an additional credit.
In some cases, the outer boundary of the buffer may need to be modified to capture and treat overland flow from adjacent pervious and/or impervious areas by creating a shallow depression area or filter strip designed to maintain sheetflow conditions. The drainage to stream or shoreline buffer credit is computed as follows:
The total area draining by sheet flow into the buffer from adjacent areas can be subtracted from total site area in the Vwq calculation portion of the total storage volume (Chapter 10). The credit is numerically expressed for each of the four MPCA Vwq sizing rules using the following equations:
Rule 1 (Stormwater Ponds and Constructed Wetlands) and Rule 3 (Non-Ponds):
''''''''''Rule 2 (Stormwater Ponds and Constructed Wetlands Draining to Special Waters) and Rule 4 (Non-Ponds Draining to Special Waters):
The post-development curve number (CN) used to compute the Vcp, Vp10, and Vp100 for the contributing buffer area can be assumed to be ”woods in good condition” when calculating the total site CN.
It is HIGHLY RECOMMENDED that drainage to stream or shoreline buffers satisfy the following conditions to be eligible for credit.
Additional sources of information on buffers can be found in MCWD (2001) and Minnesota Forest Resources Council (1999)
Surface disconnection spreads runoff from small parking lots, courtyards, driveways, sidewalks and other impervious surfaces into adjacent pervious areas where it is filtered or infiltrated. Note that rooftop disconnection is discussed in the next credits section. In most cases, the site is graded to divert sheet flow into a vegetated filter strip or pervious area for treatment. Disconnecting small areas of impervious cover from the storm drain system can greatly reduce the total volume and rate of stormwater runoff.
Credits for surface disconnection are subject to numerous restrictions concerning the length, slope, soil characteristics of the pervious area which are designed to prevent any reconnection of runoff with the storm drain system. In some cases, minor grading of the site may be needed to promote overland flow and vegetative filtering.
Two kinds of stormwater credit (water quality and CN adjustment) can be given for disconnecting surface impervious cover at a development site:
The total disconnected impervious area (DIA) is subtracted from the total site area when computing the Vwq portion of the total storage volume (Chapter 10). The following equations indicate how the credit is computed for the four MPCA sizing rules:
Rule 1 (Stormwater Ponds and Constructed Wetlands) and Rule 3 (Non-Ponds):
Rule 2 (Stormwater Ponds and Constructed Wetlands Draining to Special Waters) and Rule 4 (Non-Ponds Draining to Special Waters):
The post-development curve number (CN) used to compute the Vcp, Vp10, and Vp100 for the area of disconnected impervious cover area can be assumed to be “grass in good condition” when calculating the total site CN.
The disconnection credit is subject to numerous conditions and restrictions, as outlined below:
Disconnection of rooftops offers an excellent opportunity to spread rooftop runoff over lawns and other pervious areas where it can be filtered and infiltrated. Downspout disconnection can infiltrate runoff, reduce runoff velocity, and remove pollutants. Alternately, downspouts can be directed to a dry well, rain garden or surface depression. Stormwater credits could be offered for rooftop disconnections that effectively spread runoff over an acceptable pervious area that provides reasonable filtering and/or infiltration. In some cases, individual lots may need minor grading to meet minimum overland flow conditions. Two types of stormwater credits (water quality and CN adjusted) are possible for rooftop disconnections:
The combined area of disconnected rooftops is subtracted from the total site area when computing Vwq as shown in the equations below:
''''''''''Rule 1 (Stormwater Ponds and Constructed Wetlands) and Rule 3 (Non-Ponds):
Rule 2 (Stormwater Ponds and Constructed Wetlands Draining to Special Waters) and Rule 4 (Non-Ponds Draining to Special Waters):
The post-development curve number (CN) used to compute the Vcp, Vp10, and Vp100 for the disconnected rooftops can be assumed to be grass in good condition when calculating the total site CN.
It is HIGHLY RECOMMENDED that the rooftop disconnection credit is subject to the minimum conditions outlined below:
Curbs, gutters and storm drains are all designed to be hydraulically efficient in removing stormwater from a site. However, they also increase peak runoff discharge, flow velocity, and the pollutant delivery to downstream waters. Grass channels are preferable to curb and gutters as a conveyance system, where development density, topography, soils and slopes permit. While research has not demonstrated that grass channels remove pollutants reliably enough to qualify as a BMP (Winer, 2000), they have been shown to reduce runoff volumes during smaller storms when compared to curbs and gutters. Stormwater credits are provided for certain grass channel designs, based on their ability to reduce runoff volume through infiltration and soil filtration. Two credits (water quality and CN adjusted) can be applied when grass swales are used at a site:
The non-roadway portion of the area draining to the swale can be subtracted from the total site area when computing Vwq portion of the total storage volume (Chapter 10) using the following equations:
Rule 1 (Stormwater Ponds and Constructed Wetlands) and Rule 3 (Non-Ponds):
''''''''''Rule 2 (Stormwater Ponds and Constructed Wetlands Draining to Special Waters) and Rule 4 (Non-Ponds Draining to Special Waters):
While the post-development curve number (CN) used to compute the Vcp, Vp10, and Vp100 does not change, grass channels may increase the time of concentration and thereby reduce required storage volumes.
It is HIGHLY RECOMMENDED that grass channels meet the following minimum conditions to be eligible for credit:
This section presents guidance to local reviewing authorities on how to establish and administer an effective stormwater credit system in the community.
Experience in other states has shown that it can take a while for both local plan reviewers and engineering consultants to understand and effectively use credits during stormwater design. Adoption of credits by a local regulator is particularly difficult in communities where stormwater design occurs long after final site layout, giving designers or plan reviewers little chance to apply the better site design techniques at the heart of the credit system.
Four ingredients appear to be important in establishing an effective local credit system:
If a community feels it has many of these ingredients in place, it is ready to decide whether to offer some or all of the credits described in this chapter. The first step in the adoption process is to review each stormwater credit to ensure whether it is appropriate given local conditions and review capability. Plan reviewers should pay close attention to how credit conditions and restrictions will be defined. It may be advisable to establish a team of local consulting engineers, plan reviewers and contractors to test out the proposed credits on some recently submitted site plans to make sure they are workable. Future plan review conflicts can be avoided when designers and plan reviewers agree on how credits will be handled in the local development review process.
Stormwater credits need to be explicitly addressed during three stages of the local development review process, as shown below:
The first stage where credits are considered is during initial stormwater concept design prior to site layout. The designer should examine topography and flow patterns to get a sense for how stormwater can be distributed and disconnected across the site, and explore opportunities to orient lots, grading or conveyance to maximize use of better site design techniques in the proposed site plan. While stormwater credits can be applied to any kind of site, they are ideally suited for low density residential development, particularly when open space or conservation designs are planned.
Communities may also elect to offer additional stormwater credits to promote adoption of innovative practices such as green rooftops, soil compost amendments, permeable pavements, and stormwater planters, using the same area-based computational approach outlined for the credits in this Chapter.
Once better site design techniques are incorporated into the site plan, the designer can delineate the approximate areas at the site that are potentially eligible for stormwater credits, making sure that credit areas do not overlap. Ideally, proposed credit areas are drawn directly on the stormwater element of the site plan. Next, the adjusted Vwq is computed, and the remaining elements of the BMP treatment system are sized and located. The local review authority then checks both the credit delineations and computations as part of the review of the stormwater concept plan.
The credits are reviewed a second time during final design to confirm whether they meet the site-specific conditions outlined earlier in this chapter (e.g., slope, contributing drainage area, flow path lengths, etc). The designer should be able to justify the precise boundaries of each credit area on the plan, and indicate in the submittal whether any grading or other site preparation are needed to attain credit conditions (this is particularly important for rooftop disconnection and grass channel credits). Designers should be encouraged to use as many credits as they can on different portions of the site, but plan reviewers should make sure that two or more credits are not claimed for the same site area (i.e., no double counting). Reviewers should carefully check the delineation of all credit areas, make sure flow paths are realistic, and then approve the adjusted Vwq for the site. In addition, the plan reviewer should check to make sure that any required easements or management plans associated with the credit have been secured prior to approval.
Field inspection is essential to verify that better site design techniques used to get the stormwater credits actually exist on the site and were installed properly. This is normally done as a site walk through as part of the final stormwater inspection at the end of construction. To ensure compliance, communities may want to set the value of performance bond for the stormwater system based on the unadjusted Vwq for the site (pre-credit) to ensure better site design techniques are installed properly.