Baseline year is the year from which stormwater practices can be credited toward meeting a total maximum daily load (TMDL) wasteload allocation (WLA). That is, any best management practice (BMPs) or activity implemented during or after the baseline year that results in a reduction in pollutant loads from a municipal separate storm sewer system (MS4) to the impaired waterbody can be considered as progress towards meeting the MS4 wasteload allocation (WLA).
The implementation plan should include information about how the WLA was calculated, or it can refer to this information if it exists in another document. The following may be useful for an MS4, particularly if the MS4 intends on utilizing the same model to track progress toward achieving the WLA.
Since the stormwater program advocates an accounting process for achieving the WLA, with a percent reduction in loading being the target, it is important to define the baseline condition from which calculations will be made. The baseline must include a year but may include additional information, such as a summary of BMPs considered in deriving the WLA. Those BMPs cannot be applied toward the WLA.
For TMDLs developed with short-term monitoring data, such as two or three years, the baseline year will be one of those years. When long-term monitoring data is used it is difficult to determine the appropriate baseline year. TMDL authors, TMDL project managers, Stormwater Program staff, and stakeholders should work together to determine an appropriate baseline year. When a baseline is not clearly defined in the TMDL or implementation plan, Stormwater Program staff will determine the baseline.
Examples of baselines from TMDLs developed in Minnesota are provided below. In general, more recently-approved TMDLs provide clearer target loads and baselines.
Many Total Maximum Daily Loads (TMDLs) define a baseline year.
The guidance belows can be used to assist Municipal Separate Storm Sewer System (MS4) Permittees in completing the MS4 General Stormwater Permit Application and the Commissioner-approved TMDL Annual Reporting Form (TMDL Form). The guidance contains information about baseline years for approved TMDLs that did not explicitly define a baseline year in the TMDL report. The List of Approved TMDLs with MS4 WLAs (updated November 2019) also includes the baseline year identified in the TMDL, or the MPCA recommended baseline year included in the guidance below.
Please click here to download the baseline year guidance document: File:TMDLbaselinesMS4.xlsx