Comment: The heading notes that there are two different rates for group B soils, but only one is displayed. The old manual used to have a 0.6 inches per hour rate for group B soils.
Response: As part of the MIDS project, a technical team evaluated the infiltration table and determined there should be one value for B soils (0.3 in/hr). The heading is corrected. This is an important change and we are discussing how to inform Manual users about these types of changes.
Comment: This (Stormwater pond/wetland O & M checklist) is a very comprehensive list; most of the criteria would be helpful. It should be reformatted so that it prints more clearly and in a smaller number of pages. A 4 page check list when you are inspecting a pond is too much.
Response: In the header for select checklists we have added an option to access an Excel version of the checklist