GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM PROGRAM
TABLE OF CONTENTS
I. PERMIT COVERAGE AND LIMITATIONS
II. SUBMITTING THE APPLICATION
III. STORMWATER DISCHARGE DESIGN REQUIREMENTS
A. Stormwater Pollution Prevention Plan Content
B. SWPPP Amendments
C. Temporary Sediment Basins
D. Permanent Stormwater Management System
E. Record Retention
F. Training Requirements
IV. CONSTRUCTION ACTIVITY REQUIREMENTS
A. Stormwater Pollution Prevention Plan
B. Erosion Prevention Practices
C. Sediment Control Practices
D. Dewatering and Basin Draining
E. Inspections and Maintenance
F. Pollution Prevention Management Measures
G. Final Stabilization
A. Applicability Criteria
B. Record Availability
C. Prohibitions
D. Transfer of Ownership or Control
E. Civil and Criminal Liability
F. Severability
G. NPDES/SDS Rule Standard General -Conditions
H. Inspection and Entry