Equipment ____________________________________
Material _____________________________
Date: -_____________
A/th> | B | C | D | E | F | G |
---|---|---|---|---|---|---|
Speed | ||||||
Lever position or gate setting | Pounds spread in 10 feet* | Spread width in feet | Coverage area in sq. ft. (D x 10)* | Application rate in lbs./1000 ft2 (1000/E x C) | Application rate in lbs./lane mile (12’ width) (F x 63.4) | |
Example | ||||||
20 MPH | Half-closed | 0.4 lbs | 13 feet | 130 sq. ft. | 3.1 lbs. per 1000 sq. ft. | 196 lbs./mile |