Original file(1,008 × 669 pixels, file size: 252 KB, MIME type: image/jpeg)


This sediment basin was converted to a permanent (post-construction) stormwater basin after the contributing drainage area was fully stabilized. Note the emergency overflow with rock lining at upper right. (Source: Tetra Tech)

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current13:53, 29 January 2019Thumbnail for version as of 13:53, 29 January 20191,008 × 669 (252 KB)ZKolsum (talk | contribs)