Navigation
Main page
Table of contents
Index (Categories)
What's new
Response to comments
Future updates
Events
In the News
Funding
Recent changes
Help
Export to pdf
Tools
Special pages
MPCA Links
MPCA Homepage
Stormwater
Policies / Disclaimers
Minnesota Stormwater Manual
Search Help
Log in
Search:
Search
Gallery of new files
Special:NewFiles
This special page shows the last uploaded files.
Filter
Filename (or a part of it):
IP address or username
Show uploads by bots
Media type:
3D
Audio
Bitmap images
Compressed formats
Drawings (vector images)
Executables
Office
Rich media
Textual
Unknown
Videos
From date:
To date:
Search
Grapic representation of sizing criteria.png
Mtrojan
22:00, 16 January 2013
728 × 731; 130 KB
Approximate detention basin routing.png
PLeegar
19:48, 16 January 2013
1,500 × 1,122; 1.02 MB
Detention time vs discharge ratios.png
PLeegar
19:44, 16 January 2013
1,500 × 1,044; 490 KB
Unit peak discharge Type 2 rainfall distribution.png
PLeegar
19:38, 16 January 2013
1,500 × 1,131; 314 KB
Example code.png
Mtrojan
19:31, 15 January 2013
1,254 × 560; 235 KB
Rooftop disconnection credit example.png
Mtrojan
22:02, 14 January 2013
428 × 1,092; 254 KB
Surface impervious cover disconnection credit example.png
Mtrojan
22:02, 14 January 2013
384 × 1,093; 241 KB
Grass channel credit example.png
Mtrojan
22:02, 14 January 2013
384 × 1,092; 217 KB
Drainage to stream, wetland, shoreline buffer credit example.png
Mtrojan
22:01, 14 January 2013
384 × 1,096; 203 KB
Site reforestation credit example.png
Mtrojan
20:50, 14 January 2013
388 × 1,088; 121 KB
Natural area conservation credit example.png
Mtrojan
20:32, 14 January 2013
384 × 1,090; 215 KB
Examples of landscaped islands.jpg
Mtrojan
22:15, 10 January 2013
962 × 692; 84 KB
Vegetation in a landscaped island.jpg
Mtrojan
22:10, 10 January 2013
961 × 381; 62 KB
Example of a short driveway.jpg
Mtrojan
22:07, 10 January 2013
963 × 497; 68 KB
Sidewalk draining to adjacent vegetation.jpg
Mtrojan
22:06, 10 January 2013
957 × 722; 59 KB
Turn around options residential streets.jpg
Mtrojan
22:05, 10 January 2013
958 × 376; 35 KB
Example of traditional and bsd road designs.jpg
Mtrojan
22:03, 10 January 2013
961 × 451; 38 KB
Comparison of predevelopment, conventional and open space designs.jpg
Mtrojan
22:01, 10 January 2013
608 × 723; 66 KB
Schematic of conventional subdivision.jpg
Mtrojan
21:56, 10 January 2013
962 × 718; 109 KB
Three zone stream buffer system.jpg
Mtrojan
21:54, 10 January 2013
959 × 540; 37 KB
Potential planting areas at development site.jpg
Mtrojan
21:52, 10 January 2013
958 × 720; 117 KB
Residential subdivision showing preservation undistrurbed areas.jpg
Mtrojan
21:50, 10 January 2013
958 × 720; 100 KB
Infrequently filled parking lots.jpg
Mtrojan
21:18, 10 January 2013
961 × 722; 100 KB
Empty metro shopping parking lots.jpg
Mtrojan
21:18, 10 January 2013
961 × 721; 134 KB
Better site design principles.jpg
Mtrojan
21:15, 10 January 2013
1,127 × 612; 69 KB
Alternative parking lot collection and treatment.jpg
Mtrojan
21:15, 10 January 2013
959 × 719; 106 KB
Alternative overflow seldom used parking.jpg
Mtrojan
21:15, 10 January 2013
961 × 721; 116 KB
Alternative commercial parking lot designl.jpg
Mtrojan
21:15, 10 January 2013
961 × 721; 142 KB
Snow collected in off site large storage area.jpg
PLeegar
21:04, 10 January 2013
662 × 450; 43 KB
Snow plowed off parking lot to grassy depression.jpg
PLeegar
20:53, 10 January 2013
2,288 × 1,712; 745 KB
Plowed snow off parking lot to grass area.jpg
PLeegar
20:52, 10 January 2013
1,280 × 960; 706 KB
Drawing outflow water from below ice.png
PLeegar
20:37, 10 January 2013
1,401 × 775; 691 KB
Lowered permanent pool control.png
PLeegar
20:37, 10 January 2013
1,275 × 586; 478 KB
Simple meltwater storage.png
PLeegar
20:32, 10 January 2013
1,375 × 638; 636 KB
Applicability of BMPs for cold climate.jpg
PLeegar
16:50, 10 January 2013
720 × 540; 32 KB
Snow plowed and piled in parking lot.jpg
PLeegar
16:31, 10 January 2013
720 × 540; 41 KB
Snow plowed and piled on road.jpg
PLeegar
16:31, 10 January 2013
879 × 586; 60 KB
Percolation of water through snowpack.jpg
PLeegar
21:03, 9 January 2013
960 × 720; 48 KB
Areas removed from roadways and high traffic 2.jpg
PLeegar
20:05, 9 January 2013
1,280 × 960; 98 KB
Area of snow accumulation 1.jpg
PLeegar
20:03, 9 January 2013
1,280 × 960; 163 KB
Direct paved surface with heavy traffic 2.jpg
PLeegar
19:47, 9 January 2013
960 × 720; 95 KB
Snowpack accumulation and washoff compared to rainfall.png
PLeegar
19:36, 9 January 2013
1,367 × 817; 186 KB
Snow image 1.jpg
PLeegar
19:24, 9 January 2013
450 × 360; 30 KB
Overlapping jurisdictions.png
Mtrojan
15:22, 7 January 2013
893 × 911; 188 KB
BMP recommended practices.xls
Mtrojan
14:35, 7 January 2013
; 45 KB
Plot of construction and maintenance costs for wet basin.png
Mtrojan
14:53, 3 January 2013
1,333 × 949; 168 KB
BMP matrix 4.png
Mtrojan
14:05, 3 January 2013
1,449 × 507; 447 KB
BMP matrix 3.png
Mtrojan
14:05, 3 January 2013
1,355 × 632; 479 KB
BMP matrix 2.png
Mtrojan
14:04, 3 January 2013
1,350 × 650; 498 KB
BMP matrix 1.png
Mtrojan
14:04, 3 January 2013
1,409 × 672; 548 KB
(
newest
|
oldest
) View (
newer 50
|
older 50
) (
20
|
50
|
100
|
250
|
500
)
Search:
Search
Privacy policy