• ==Extreme flood control criteria (V<sub>p100</sub>)== The goal of extreme flood criteria is to maintain the boundaries of the pre-development 100-year floodplain, r
    7 KB (1,029 words) - 19:17, 6 December 2022
  • ...gory:Level 3 - Best management practices/Specifications and details/Design criteria]]
    997 bytes (153 words) - 22:45, 3 December 2022
  • ...ns_-_filter_media Bioretention filter media]. This section on the [[Design criteria for bioretention]] page provides a discussion on phosphorus management with
    1 KB (186 words) - 18:32, 8 December 2022
  • ...=18984 Construction General Permit]. The current MPCA water quality volume criteria is referred to as the “hybrid rule” because it encompasses different ru '''[[Unified sizing criteria#Computing water quality volume|Rule 1]]'''
    8 KB (1,248 words) - 19:16, 6 December 2022
  • **[[Design criteria for stormwater wetlands]]
    1 KB (168 words) - 14:23, 26 July 2022
  • ...ortant tool for retention and detention of stormwater runoff. Depending on design and construction, swales may provide additional benefits, including cleaner ...nd have limited treatment capability. Incorporation of check dams into the design allows treatment of a portion or all of the [https://stormwater.pca.state.m
    3 KB (451 words) - 22:16, 23 November 2022
  • ...gory:Level 3 - Best management practices/Specifications and details/Design criteria]]
    1 KB (199 words) - 22:44, 3 December 2022
  • ...e media phosphorus content 30 mg/kg or less per the Mehlich 3 (or [[Design criteria for bioretention#Notes about soil phosphorus testing: applicability and int ...e media phosphorus content 30 mg/kg or less per the Mehlich 3 (or [[Design criteria for bioretention#Notes about soil phosphorus testing: applicability and int
    5 KB (668 words) - 13:17, 3 August 2022
  • Stormwater wetlands are similar in design to [[stormwater ponds]] and mainly differ by their variety of water depths *[[Design criteria for stormwater wetlands]]
    2 KB (316 words) - 01:09, 8 February 2023
  • *[[Design criteria for wet swale (wetland channel)]]
    1 KB (180 words) - 22:21, 23 November 2022
  • <th>Planning and design step</th> ...hieve stormwater management objectives in conjunction with other community design objectives.</td>
    5 KB (691 words) - 22:45, 8 December 2022
  • ...nveyance system further downstream. Check dams incorporated into the swale design allow water to pool up and infiltrate into the underlying soil or engineere *[[Design criteria for dry swale (grass swale)]]
    3 KB (435 words) - 16:08, 9 February 2023
  • ...sizing criteria|<font size=3>Schematic illustrating five different sizing criteria,</font size>]] ...the local community. The unified approach addresses five different sizing criteria, as shown below.
    10 KB (1,552 words) - 19:14, 6 December 2022
  • ...he P content must be less than 30 mg/kg (ppm) per Mehlich III (or [[Design criteria for bioretention#Notes about soil phosphorus testing: applicability and int ...rain the P content must be less than 30 mg/kg per Mehlich III (or [[Design criteria for bioretention#Notes about soil phosphorus testing: applicability and int
    5 KB (841 words) - 21:13, 22 December 2022
  • ...discussion focuses on wet extended detention ponds; however, all four main design variants are presented here for the sake of completeness. ==Flow-through pond (no extended detention) design==
    5 KB (710 words) - 21:02, 15 August 2022
  • ==Design criteria== ...fing Systems, available at http://www.spri.org, gives guidelines on how to design to minimize wind damage in green roofs, including, for example, how to eval
    6 KB (867 words) - 22:40, 3 December 2022
  • ==Design criteria== ...underground, along the perimeter or an area, or in what is called a pocket design.
    4 KB (655 words) - 22:39, 3 December 2022
  • *Permittees must design basins using an impermeable liner if located within active karst terrain. ...and 2, clay liners are generally not recommended. Links to information on design and installation is recommended. For additional information see [[Liners fo
    10 KB (1,408 words) - 01:18, 7 December 2022
  • ...mporarily store stormwater before allowing it to infiltrate into the soil. Design variants include; the infiltration basin, the infiltration trench, the dry *[[Design criteria for Infiltration basin]]
    3 KB (333 words) - 16:26, 12 January 2023
  • ==Design criteria== #Will the manufacturer provide design computations and CADD details?
    5 KB (743 words) - 13:48, 8 December 2022

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)