The purpose of this section is to provide step-by-step examples on how to fill out the three required tabs in the TMDL Form. These are the BMP-Activites completed tab, the Cumulative reductions tab, and the Adaptive management strategy tab. The Permittee is not required to report on every BMP/activity that has been implemented, but instead just on those BMP/activities that are being applied to applicable WLAs. Each BMP contained in the dropdown box of column E of the BMP-Activities completed tab will be covered in the examples. Please read overview of categories before continuing on with the examples.
In order to complete the TMDL reporting form, it is important that the permittee have a means to:
This information is provided in the figures we will be referring to throughout each example. The subsequent sections will demonstrate how to take that information and translate it to the TMDL reporting form.
This example set uses maps 1 and 2, which appear on the right hand side of the page. Each map covers the same area with one exception. Map 1 depicts structural BMPs and Map 2 depicts non-structural BMPs. Regardless of BMP type, the TMDLs required to be reported on are the same.
The example covers a metro area TMDL, the Metroshed WRAPS, with four MS4 permittees (City A, City B, City C, and MS4 College) and four impaired waters. The following TMDLs have been completed to address these impairments:
City A has been assigned WLA for three of the five TMDLs included in the Metroshed WRAPS project, the Lake 1: Phosphorus, Lake 2: Phosphorus, and Lake 3: Phosphorus TMDLs. As noted in the previous section, the baseline year for each TMDL is 2010. Since the baseline, City A has implemented 14 BMP/activities that can be credited as progress toward achieving an applicable WLA. Note that all 14 BMP/activites do not apply to each TMDL WLA. Table 1 illustrates which TMDL each BMP can be credited to and in what category. See map 1 to for location of category 1 BMPs and map 2 for location of category 2 BMPs. You will notice that there are four BMPs (employee education, establish ordinance, public education, and street sweeping) listed under category 2 that are not located on map 2. This is simply because they cannot be associated with a single point within the watershed. Also of note is the record under category 3. Category 3 BMPs will not be translated to the BMP-Activities completed tab. These are activities that constitute progress, which meets the permit requirement for a given year, but cannot be associated with a reduction in pollutant loading.
Table 1
a INF1 and MD2 were constructed as a joint project between City A and City B
b These BMPs do not appear on the maps because they are not associated with a discrete location
c SR1 is owned by MS4 College, but City A contributes to maintenance