This site is currently undergoing revision. For more information, open this link.
Information for this page has not been developed. It is anticipated this page will be populated in winter of 2014

The following is a quick guide to complete the BMPs-Activities completed tab.

Gathering BMP information

STEP 1: Inventory BMPs that

  • are treating water discharged to waterbodies with an approved TMDL as indicated in your form
  • reduce pollutants prior to discharge from your MS4
  • you described in your Compliance Schedule on your TMDL Attachment Spreadsheet at the time of application
  • have been operational since the baseline year of that TMDL but not prior to the baseline year
  • meet criteria for category 1 or category 2 BMP types


STEP 2: Identify the location of your MS4 in relation to watershed boundaries and the TMDL study area
STEP 3: Plot the location of inventoried BMPs for which you have geographic locations
STEP 4: Determine from which TMDL the BMPs reduce pollutants

Enter BMP information into the spreadsheet

Example data shown for a rain garden in City A, for more details see examples.

STEP 5: Enter the reporting year by using the drop down menu in column D. Columns A through C autofill.

city_a_activities1
Step 5







STEP 6: In Column E, enter your first BMP, selecting the appropriate category from the dropdown box. Complete Column F (dropdown) if desired. For guidance, click here.

city_a_activities2
Step 6






STEP 7: Complete columns H, I, J, and K if they did not autofill. These are ID number and locational coordinates for the rain garden (INF1). For guidance, click here.

city_a_activities1
Step 7







STEP 8: Complete Columns L and M. From the dropdown in Column L select the owner/operator of the BMP. Column M autofills if you are the owner, otherwise enter the name of the owner/operator of the BMP. For guidance, click here.

city_a_activities1
Step 8







STEP 9: Complete Columns N and O if desired. This rain garden was installed and was operational in 2010. City A enters “2010” in Column N. No comments are added to Column O.

city_a_activities1
Step 9






STEP 10: Associate the BMP with TMDLs. City A determines that the rain garden is reducing pollutants draining to the Lake 2 Phosphorous TMDL. City A indicates this with an “X” in Column Q. For guidance, click here.

city_a_activities1
Step 10