This page provides step-by-step examples on how to fill out the four required tabs in the Commissioner-approved Total Maximum Daily Load (TMDL) Form from the perspective of five fictional permittees. These are the BMP-Activites completed tab, the Cumulative reductions tab, the Category 3 BMPs- Activities tab, and the Adaptive management strategy tab. (Note: the terms "tab" and "worksheet" are used interchangeably.)
Permittees are not required to report on every Best Management Practice (BMP) or activity that has been implemented, but instead just on those BMPs or activities that are being applied to applicable TMDL Wasteload Allocations (WLAs). Each BMP contained in the dropdown box of column E of the BMP-Activities completed tab will be covered in the examples. Please become familiar with the Guidance for completing the TMDL reporting form before continuing on with the examples.
In order to complete the TMDL form, it is important that the permittee have a means to
TMDL reports provide maps and acreages for TMDL study areas. Shapefiles of TMDL study areas can be found at [1]. Permittees are required to develop maps showing locations of structural BMPs, so this information should already exist. By overlaying the TMDL study areas on the map containing structural BMPs, permittees can determine which BMPs can be applied to specific TMDLs. For BMPs and activities that are not mapped, permittees will have to determine if the BMP or activity lies within a particular TMDL study and therefore can be applied to that TMDL.
This type of information is provided in the hypothetical scenarios and figures shown below. The subsequent sections will demonstrate how to take that information and translate it to the TMDL form.
This example set uses Maps 1 and 2, which appear on the left and right hand side of the page. Each map covers the same area and the same TMDLs. Map 1 depicts BMPs that require estimated cumulative reductions (Category 1 BMPs) and Map 2 depicts BMPs that do not (Category 2 BMPs). See cumulative reductions section for more information). Additional Category 2 BMPs that cannot be mapped as points, such as education and street sweeping, are not shown on the maps but are included in examples to show where such BMPs are reported in the form.
The example covers a theoretical Twin Cities Metro Area TMDL called the Metro Watershed WRAPS, with four MS4 permittees (City A, City B, City C, and MS4 College) and four impaired waters (the examples do not cover protection aspects of a WRAPS because they are not subject to NPDES permitting requirements). The following TMDLs have been completed to address the impairments:
This is the portion of the TMDL form where information on all completed BMP/activities resulting in a reduction in pollutant loading, and that apply to an approved TMDL WLA/s must be provided.
In this example we included information for a second year of reporting (2015) and a theoretical compliance schedule submitted by City A at the time of application (Part III.E.3).
City A has been assigned WLAs for three TMDLs included in the Metro Watershed WRAPS project.
As noted in the previous section, the baseline year for each TMDL is 2010. Since the baseline, City A has implemented 14 BMPs and activities that can be credited as progress toward achieving one or more applicable WLA. The table to the left illustrates to which TMDL and Category each BMP can be credited. See Map 1 for location of Category 1 BMPs and Map 2 for location of Category 2 BMPs (location information for Category 2 BMPs is not required for TMDL reporting but is included for purposes of the example). There are four BMPs (employee education, establish ordinance, public education, and street sweeping) listed under Category 2 that are not located on maps because they cannot be associated with a single point within the watershed (i.e. they are applied over broad areas). One Category 3 BMP, a feasibility study for a rain garden retrofit, is listed in the table but will not be included in the BMP-Activities completed tab. Category 3 BMPs constitute progress, which meets the permit requirement for a given year, but cannot be associated with a reduction in pollutant loading. These activities will remain in the Category 3 BMPs-Activities worksheet for the duration of the permit term.
The schematic to the right illustrates how data are entered for one BMP, INF1 (see Map 1 for location of INF1). The first entry is the Reporting Year, which is selected from a dropdown list in Column D. For this example, the permittee selects 2014. Cells A through C are autofilled once the reporting year is selected. The permittee then enters data in Columns E through M (Column F is optional). Because INF1 is a structural BMP, the geographic coordinates (x and y location coordinates) must be entered as well as the type of coordinate system used. Columns N and O are optional. Once the information for INF1 is entered, the permittee selects all the TMDLs to which the BMP is applied. This starts in Column Q. Once completed, the permittee moves on to the next row where the next BMP and associated information are entered. City A would continue this process until all 14 BMPs have been translated to the BMP-Activites completed worksheet.
When completed, City A's BMP-Activites completed worksheet for 2014 may look similar to the following screenshot.
For purposes of this example, assume the screenshot below is the compliance schedule submitted by City A at the time of application. Two of the three BMPs with a 2014 implementation date appear in the BMP-Activities completed worksheet to the right for the first reporting year. The third BMP, the "Raingarden retrofit assessment", will remain in the Category 3 BMPs-Activities worksheet for the duration of the permit term. See the Category 3. Non-implemented Activities (Reported in Category 3 BMPs - Activities tab) section of the guidance for the definition of a Category 3 activity.
For this example, assume the screenshot below illustrates what City A's BMP-Activities completed worksheet looks like in 2015. The highlighted record is the only BMP added to the worksheet because it was the only BMP fully implemented by City A in 2015. This BMP was included in the permittee's compliance schedule as "Implement raingarden retrofit". Note this BMP was scheduled for implementation in 2015 and is a retrofit of an existing BMP (INF1). The BMP was reported in the Category 3 BMPs-Activities worksheet for the 2014 Annual Report but was completed in 2015, and therefore translated to the BMP-Activities completed worksheet in the 2015 Annual Report. See the Category 3 BMPs-Activities worksheet section of this document for screen shot examples.
No record should be altered from a previous reporting year. Thus, the entry for INF4 will not be modified. The "BMP improvement enhancement retrofitting" category from the dropdown list in Column E, accompanied by an explanation in Column O, will be sufficient since this is not a new BMP but instead an enhancement of an existing BMP. If a unique situation presents itself, contact MPCA Stormwater staff for further guidance.
City B has been assigned WLAs for two TMDLs in the Metro Watershed WRAPS project:
Since the baseline of the TMDLs (2010), City B has implemented four BMP/Activities that can be credited as progress toward achieving an applicable WLA. As depicted on Map 1, no structural BMPs are constructed within City B's jurisdiction. However, City B has collaborated with other MS4 permittees on the following projects:
City B may also record their supplemental street sweeping program because they do sweeping within the Lake 1 and Lake 2 watersheds. They may also take credit for eliminating an illicit discharge. Note that all these BMPs/activities must have been implemented since 2010, the baseline year. For example, street sweeping may have been implemented prior to 2010, but enhancements to the existing street sweeping program would qualify as a Category 2 BMP.
All BMPs implemented by City B are recorded as a Category 2 reduction unless the permittee can reasonably demonstrate an appropriate method for quantifying it in Category 1.
The permittee enters information for each of the four BMPs/activities as described above for City A. The screenshot below is an example of how the BMP-Activities completed worksheet may look when complete.
City C has been assigned WLAs for all five TMDLs included in the Metro Watershed WRAPS project:
Since the baseline of the TMDLs (2010), City C has implemented 11 BMPs that can be credited as progress toward achieving an applicable WLA. these are summarized in the table below. Note that several BMPs are applied to more than one TMDL (e.g. the swale, S2, is applied to the Lake 3 TMDL and the two stream impairments). As with City A and City B, City C implements BMPs that cover their entire jurisdictional area (e.g. employee education) and these BMPs can be applied to all five impairments.
in this example, Maps 1 and 2 do not show the watershed boundaries for the impaired stream. The City will have to determine those boundaries prior to determining if BMPs can be applied to the stream impairments. The City must also determine if a particular BMP will actually reduce pollutant loads. For example, swales are typically ineffective at removing bacteria but the swale included in the worksheet may have been designed such that bacteria will be removed. However, if that is not the case, the BMP should not be applied to the bacteria TMDL.
The screenshot below is an example of how the BMP-Activities completed worksheet may look when complete.
MS4 College has been assigned a WLA for one TMDL included in the Metro Watershed WRAPS project:
Since the baseline of the TMDL (2010), MS4 College has implemented 5 BMPs that can be credited as progress toward achieving an applicable WLA. The table below illustrates to which category each BMP/activity is applicable. Note that MS4 College is located entirely within the jurisdiction of City A. This provides a unique partnership opportunity for the two MS4 permittees. As a result, the two have an agreement in place for City A to perform street sweeping on campus. Each permittee can therefore claim a Category 2 credit. MS4 College, however, indicates on its form that City A is the owner/operator of this BMP.
BMP FIL1 is owned and operated by MS4 College. City B claimed a category 2 credit for this BMP because it contributed funding for the BMP, but only MS4 College can claim this as a Category 1 BMP because it occurs within their jurisdiction.
The screenshot below is an example of how the BMP-Activities completed worksheet may look when complete.
This is the portion of the TMDL report form that the permittee will report the cumulative reduction achieved for each TMDL WLA. See the cumulative reductions section of the guidance for information on each of the reporting categories.
The screenshot below illustrates how City A's Cumulative reductions worksheet should look for 2014 Annual Report. City A chose to estimate load reductions using the MPCA estimator. Details for how this tool was used can be found in the guidance and examples for using the MPCA Simple Estimator.
The following screenshot is an example of City A's 2015 Cumulative reductions worksheet submission. It is very similar to what was submitted for 2014 because only one BMP was fully implemented, that being the retrofit of INF1. This record was labeled as "Implement raingarden retrofit" in the 2014 Category 3 BMPs-Activities worksheet (row 4) and has been translated to the BMP-Activities completed worksheet in the 2015 Annual Report to show that the BMP has been fully implemented. The update is also reflected in the Category 3 BMP-Activities worksheet. See the Category 3 BMPs-Activities worksheet section of this document for screen shot examples.
Because the implemented retrofit improved the pollutant reduction capability of an existing structural BMP, INF1, it can be quantified in Category 1. Prior to the retrofit, INF1 treated 2 acres of land classified as Residential-medium density (see MPCA estimator screen shot). Assuming the INF1 retrofit doubled the Residential-medium density land area treated (2 acres treated by INF1 in 2014; 4 treated by INF1 in 2015 after completed retrofit), the cumulative reduction reported in 2015 for the Lake 2: Phosphorus TMDL would increase from 2.004 pounds to 4.008 pounds.
City B had implemented no structural BMPs within its jurisdiction from the baseline to the first year of reporting. All reductions are therefore reported as Category 2 and would appear as follows in the screenshot below.
City C had implemented a variety of BMPs from the baseline of the TMDL to the first year of reporting. Similar to City A, reductions have been reported in both Category 1 and 2. Category 1 reductions were calculated using the MPCA estimator and examples of its use can be found in the guidance and examples for using the MPCA Simple Estimator.
MS4 College had implemented a variety of BMPs from the baseline of the TMDL to the first year of reporting. Reductions have therefore been reported in both Category 1 and 2. Category 1 reductions were calculated using the MPCA estimator and examples of its use can be found in the guidance and examples for using the MPCA Simple Estimator.
This is the portion of the TMDL form that must contain planned BMPs that have not yet been implemented but were submitted as a part of the compliance schedule in the MS4 Permit TMDL Attachment spreadsheet at the time of application. This worksheet will also store records that constitute progress but do not achieve a reduction (e.g. planning, feasibility studies, acquisition of funding, etc.). The subsequent section will only cover an example for City A.
The screen shot below illustrates the Category 3 BMPs-Activites worksheet for 2014. This contains all but two of the BMPs ("Permeable pavement with no underdrain" and "Increased street sweeping") from the compliance schedule screen shot in the BMP-Actvities completed section for City A. Those BMPs have been reported in the BMP-Activities completed worksheet because they were fully implemented in 2014. You will notice that one activity ("Feasability study - Raingarden retrofit assessment") fully implemented in 2014 remains in the Category 3 BMPs-Activites worksheet. This is because it does not receive credit for a reduction in pollutant loading but does demonstrate that the permittee is making progress.
The following screen shot illustrates the Category 3 BMPs-Activites worksheet for the 2015 Annual Report. This submission will contain all the BMPs from the 2014 Annual Report except for the highlighted record ("Implement raingarden retrofit"). This has now been translated to the BMP-Activities completed worksheet because it was fully implemented in 2015 (see the screen shot of City A's BMP-activities completed worksheet for the 2015 Annual Report). This process will continue each year of the permit term as BMPs/activities are completed.
Refer to the Adaptive Management Strategy section of the guidance for an example on how to fill out this portion of TMDL form.
The following example covers a theoretical outstate area TMDL, the Big River TMDL, with one MS4 Permittee (City D). Maps 3 and 4 will be used to aid the discussion. Each map covers the same area, all of which is within the jurisdictional boundary of City D. Map 3 depicts structural BMPs and Map 4 depicts the six AUIDs (Assessment Unit ID, or different stream reaches) TMDLs have been completed on.
As you may know, stream TMDLs use a Load Duration Curve (LDC) approach. The result is WLAs assigned to MS4s across five flow regimes (High, moist, mid-range, dry, low), which in this example, would equate to 30 total TSS WLAs and 30 total E. coli WLAs. Permittees are not required however, to report on each individual flow regime. For ease of reporting, the Permittee is allowed to report on groupings of WLAs within the same report. Stream TMDLs will therefore be represented according to TMDL Project Name + Pollutant by default. In this example, City D has been assigned TSS and E. coli WLAs for each of the six stream reaches (AUIDs) in the Big River TMDL project (6 TSS TMDLs and 6 E.coli TMDLs). These will be grouped into two TMDL WLAs to report on:
This is the portion of the TMDL report form that the permittee will provide information on all BMPs being applied to a TMDL WLA/s.
As mentioned previously, City D has been assigned WLA for TSS and E. coli TMDLs on all six of the impaired stream reaches included in the Big River TMDL. As a result of the grouping approach, the reporting requirement is as follows:
Since the baseline of the TMDL (2005), City D has implemented 11 BMPs that can be credited as progress toward achieving an applicable WLA. The table below illustrates which TMDL each BMP can be credited to and in what category. All BMPs are implemented within the Big River TMDL study area. Per the grouping approach, all BMPs are applied to all stream reaches so long as the BMP addresses the pollutant of concern. The following screen shot is an example of how the BMP-Activities completed worksheet may look when complete.
This is the portion of the TMDL report form that the permittee will report the cumulative reduction achieved for each TMDL WLA. See the cumulative reductions section of the guidance for information on each of the reporting categories.
City D used the MIDS calculator to estimate TSS pollutant reductions associated with implemented BMPs. The following model inputs and assumptions were used in the MIDS calculator.
Total TSS reduction by the BMPs was 28331 pounds or 7% of the total load.
The MIDS calculator does not address E. coli. The following assumptions were made for bacteria removal by BMPs.
To estimate bacteria removal, the following steps were followed.
The annual reduction in bacteria loading associated with these BMPs is 5.47 percent.
The following tables summarize the calculations for each BMP, all BMPs combined, and resulting annual reduction expressed as a percent.
Refer to the Adaptive Management Strategy section of the guidance for an example on how to fill out this portion of TMDL form.