Design process for selecting the appropriate liner level.
Link to this table
Condition | Design level | Note |
---|---|---|
Filtration BMP with less than 3 feet of separation to seasonal saturated soil or bedrock | 1 | Required under the Construction Stormwater permit |
BMP in confirmed PSH with high or very high groundwater pollution potential | 1 | |
Karst terrain with high or very high groundwater pollution potential | 1 | |
Maintain permanent pool in areas underlain by geologic material that is fractured or has a high infiltration rate | 2 | |
Separation distances cannot be achieved | 2 | |
Separate tree BMP from road, parking lot, sidewalk or adjacent walls or building foundation | 2 | To prevent tree root intrusion. See link |