Wetland/Watershed Ratio (Ac/Ac) | |||
Minimum Drainage Area (Ac) | |||
Length to Width Ratio (minimum)(ft/ft) | |||
Extended Detention (ED) | |||
Allocation of Vwq (pool/marsh/ED) in % | |||
Allocation of Surface Area (deepwater/low marsh/high marsh/semi-wet) in % | |||
Forebay | |||
Micropool | |||
Outlet Configuration |
*Note: The ED Shallow Wetland design guidance does not meet the MPCA requirements for permanent volume. The guidance may be applied in a stormwater retrofit situation where area requirements preclude the use of a Shallow Wetland