BASE BID ITEM |
ESTIMATED QUANTITY |
UNIT |
UNIT PRICE AVERAGE |
TOTAL AVERAGE BID |
Part 1 - General and Erosion Control |
MOBILIZATION |
1 |
LS |
💲23,340 |
💲23,340 |
SEDIMENT CONTROL LOG -- INSTALL, MAINTENANCE AND REMOVAL |
267 |
LF |
💲5 |
💲1,335 |
TEMPORARY FENCE -- INSTALL AND REMOVAL |
160 |
LF |
💲8 |
💲1,280 |
STABILIZED CONSTRUCTION EXIT -- INSTALL, MAINTENANCE AND REMOVAL |
1 |
LS |
💲2,410 |
💲2,410 |
EROSION CONTROL BLANKET |
424 |
SY |
$4 |
$1,696 |
STORM DRAIN INLET PROTECTION -- INSTALL, MAINTENANCE AND REMOVAL |
2 |
EA |
💲387 |
💲774 |
DUST CONTROL |
10 |
HRS |
💲121 |
💲1,210 |
Total Part 1 |
💲32,045 |
Part 2 - Removals |
REMOVE EXISTING SEDIMENT CONTROL LOG OR SILT FENCE Total Part 2 |
268 |
LF |
💲4 |
💲1,072 |
Total Part 2 |
💲1,072 |
Part 3 - Grading |
COMMON EXCAVATION -- INCLUDES TANK TRENCH EXCAVATION AND FILL TO PROPOSED GRADE |
1955 |
CY |
$9 |
$9 |
REMOVAL OF EXCAVATED MATERIAL |
1389 |
CY |
$10 |
$13,890 |
AGGREGATE BACKFILL |
1009 |
CY |
$41 |
$41,369 |
Total Part 3 |
💲72,854 |
Part 4 – Underground Storage Tank Components |
RAINWATER HARVESTING TANK (120" DIA. X 50-FEET) |
3 |
EA |
💲77,639 |
💲232,917 |
CONSTRUCT DRAINAGE STRUCTURE |
6 |
EA |
💲1,153 |
💲6,918 |
CONCRETE, REINFORCED COLLAR (RISER MANHOLE CAP) |
6 |
EA |
💲1,085 |
💲6,510 |
CONCRETE, REINFORCED COLLAR (AT RISER CONNECTION TO TANK) |
6 |
EA |
💲1,248 |
💲7,488 |
INSTALL CASTING |
6 |
EA |
💲1,221 |
💲7,326 |
18" HDPE PIPE |
115 |
LF |
💲73 |
💲8,395 |
SOIL DENSITY COMPACTION TESTING |
12 |
EA |
💲430 |
💲5,160 |
Total Part 4 |
💲274,714 |
Part 5 – Site Restoration |
RAPID STABILIZATION |
0.42 |
AC |
💲3,173 |
💲1,333 |
PERMANENT SEEDING |
0.42 |
AC |
💲6,336 |
💲2,661 |
TURF ESTABLISHMENT |
1 |
EA |
💲2,500 |
💲2,500 |
Total Part 5 |
💲6,494 |
Total Bid |
💲386,590 |
PRICE PER TANK (3 – 29,000 gallon tanks) |
💲129,060 |
PRICE PER TANK PER YEAR OVER 25 YEAR |
💲5,162 |
PRICE PER GALLON |
💲1.46 |
PRICE PER GALLON PER YEAR OVER 25 YEARS |
💲0.06 |