Bid Item | Item Description | Units | Average Price |
---|---|---|---|
2105.601/00045 | Temporary Stream Diversion System | LS | 💲26,292.50 |
2452.601/00011 | Steel Sheet Piling (Temporary) | LS | 💲107,614.29 |
2452.618/00011 | Steel Sheet Piling (Temporary) | SF | 💲16.75 |
2573.504/00010 | Sandbag Barrier | SF | 💲10.55 |
2105.601/00010 | Dewatering | LS | 💲65,587.94 |