Designed infiltration of stormwater is highly encouraged and generally preferred by regulatory agencies and stormwater practitioners. However, under certain conditions designed infiltration of stormwater presents an unacceptable risk to groundwater. Part III.D of the Construction Stormwater permit includes several prohibitions to infiltration of stormwater.
Infiltration is prohibited when the infiltration system will be constructed in
Each of these is discussed in greater detail below.
Vehicle fueling areas represent a relatively high risk for spills involving highly mobile and toxic chemicals. Gasoline compounds in particular are mobile and contain chemicals that represent a significant risk to human health and the environment (e.g. benzene). Standard designs for infiltration practices will not be adequate to treat runoff with high concentrations of these chemicals and the chemicals will readily leach through the underlying soil, thus representing a risk to groundwater. For more information, see the section on potential stormwater hotspots.
Stormwater infiltrating below an infiltration practice may require additional treatment even after passing through the media or soil in the infiltration practice. The distance needed to provide adequate treatment varies with soil and pollutants in the infiltrating water. For example, soils with high clay or organic matter contents typically retain pollutants better than sandy soils having little organic matter. A separation distance of 3 feet is commonly used for other types of infiltrating water, such as water infiltrating from a septic drain field. A separation distance of 5 feet is recommended, particularly in sandy soils, but a minimum of 3 feet separation from either bedrock or the seasonally high water table is required. For more information see the pages on shallow soils and depth to bedrock and shallow groundwater.
Infiltration is prohibited at certain industrial facilities where infiltration represents a potential risk for groundwater contamination. This prohibition exists for 5 Standard Industry Code (SIC) sectors.
Although the prohibition on infiltration at these sites does not apply to infiltration practices operating prior to April 5, 2010, the prohibition in the construction stormwater permit applies to all facilities operating under these 5 sectors. Infiltration is not allowed at any site receiving stormwater discharges from a facility operating within one of these 5 sectors. For more information, see the page on infiltration at permitted industrial sites.
Infiltrating stormwater that passes through contaminated soils or comes into contact with contaminated groundwater has a high potential to mobilize those contaminants. In addition to representing a risk to human health and the environment, mobilizing contaminants creates legal liability risks for the owner and operator of the infiltration facility. It is difficult to define what high levels of contaminants are and it is often difficult to determine if infiltration will come into contact with contaminated soil or groundwater. An example of a site where infiltration is prohibited is shown on the right.
The manual contains guidance on infiltration at sites that are or may be contaminated, including a screening assessment for contamination at potential stormwater infiltration sites.
D soils have very low infiltration rates (0.06 inches per hour in the manual). Over a 48 hour drawdown period, a soil with an infiltration rate of 0.06 inches per hour would only infiltrate 2.88 inches of water. Consequently, infiltration practices, such as bioinfiltration, permeable pavement with no underdrain, and infiltration basins are not feasible. Low infiltration rates result in extended surface ponding of water, which may damage vegetation, lead to mosquito breeding, damage soil structure, and reduce pollutant treatment by the BMP.
This prohibition may be waived by a local government unit that has a current MS4 permit. The MS4 permits has the following requirement for allowing infiltration within a DWSMA: "The permittee’s Regulatory Mechanism(s) shall restrict the use of infiltration techniques to achieve the conditions for post-construction stormwater management, without higher engineering review, sufficient to provide a functioning treatment system and prevent adverse impacts to groundwater." If infiltration is allowed on these soils, it is highly recommended that soils be modified so that increased infiltration can be achieved. For more information, see the section on soils with low infiltration capacity.
Active karst is defined as areas underlain by carbonate bedrock with less than 50 feet of sediment cover. A site with active karst has the greatest potential for development of a sinkhole below a BMP. Sinkholes can lead to catastrophic failure of a BMP. In addition, focused infiltration and recharge that results from collecting and infiltrating large amounts of stormwater at a discrete site can enhance sinkhole development. Thus the safeguards of requiring an infiltration practice to be 1000 feet upgradient or 100 feet downgradient of active karst diminish the likelihood that the infiltration will lead to sinkhole development. For more information, read the section on karst.
This prohibition may be waived by a local government unit that has a current MS4 permit. The MS4 permits has the following requirement for allowing infiltration within a DWSMA: "The permittee’s Regulatory Mechanism(s) shall restrict the use of infiltration techniques to achieve the conditions for post-construction stormwater management, without higher engineering review, sufficient to provide a functioning treatment system and prevent adverse impacts to groundwater."
A Drinking Water Supply Management Area (DWSMA) is the surface and subsurface area surrounding a public water supply well, including the wellhead protection area, that must be managed by the entity identified in a wellhead protection plan. Because stormwater infiltrating through soil may reach groundwater and impact an aquifer containing a public supply well, infiltration is prohibited within a DWSMA unless allowed by a local unit of government with a current MS4 permit. The MS4 permits has the following requirement for allowing infiltration within a DWSMA: "The permittee’s Regulatory Mechanism(s) shall restrict the use of infiltration techniques to achieve the conditions for post-construction stormwater management, without higher engineering review, sufficient to provide a functioning treatment system and prevent adverse impacts to groundwater."
For more information see the section on stormwater and wellhead protection.
Soils with very high infiltration rates have limited ability to attenuate pollutants since water is moving rapidly through the soil. A value of greater than 8.3 inches per hour is used to identify soils where infiltration is prohibited. These will typically be well sorted medium- to coarse-sands and gravels. These soils typically have low concentrations of organic matter, which makes them further susceptible to pollutant leaching.
This prohibition may be waived by a local government unit that has a current MS4 permit. The MS4 permits has the following requirement for allowing infiltration within a DWSMA: "The permittee’s Regulatory Mechanism(s) shall restrict the use of infiltration techniques to achieve the conditions for post-construction stormwater management, without higher engineering review, sufficient to provide a functioning treatment system and prevent adverse impacts to groundwater."