Project: | ||
Location: | ||
Date: | ||
Time: | ||
Inspector: | ||
Construction Sequence | Satisfactory / Unsatisfactory | Comments |
---|---|---|
1. Pre-Construction | ||
Pre-construction meeting | ||
Runoff diverted | ||
Soil permeability verified | ||
Groundwater / bedrock verified | ||
Project benchmark established | ||
Facility location staked out | ||
Temporary erosion and sediment control established | ||
2. Excavation | ||
Size and location per plans | ||
Side slopes stable | ||
Depth adjusted to soil layer with specified soil type and permeability | ||
Sub-soil not adjacent to excavation area and stabilized with vegetation and/ or silt fence | ||
Stockpile location not adjacent to excavation area and stabilized with vegetation and/ or silt fence | ||
3. Filter Fabric Placement | ||
Fabric per specifications | ||
Fabric per specifications | ||
Placed per plan location | ||
4. Aggregate Material | ||
Size as specified | ||
Clean / washed material | ||
Placed properly | ||
5. Observation Well | ||
Pipe size per plans | ||
Under-drain installed per plans | ||
Inlet installed per plans | ||
Pre-treatment devices installed per plans | ||
6. Vegetation | ||
Complies with planting specifications | ||
Topsoil complies with composition and placement in specifications | ||
Permanent erosion control measures in place | ||
7. Final Inspection | ||
Dimensions per plans | ||
Check dams operational | ||
Inlet / outlet operational | ||
Effective stand of vegetation and stabilization | ||
Contributing watershed stabilized before flow is routed to the facility | ||
Comments:
|
||
Actions to be taken:
|